# Washington County Ionwave #PUR-1826 Addendum 6

Phase 1 Detention Center Renovation and Detention Security Equipment

**Posted:** September 16, 2026
**Respond By:** October 21, 2026
**Identifier:** PUR-1826 Addendum 6
**NAICS:** 236220

Washington County is seeking bids for Phase 1 renovation of its detention center in Hagerstown, Maryland.
- **Buyer:** Washington County; county-funded project in Hagerstown, Maryland. No specific sub-agency or office is identified.
- **Scope:** Detention center renovation and related building-system work, including detention security doors and frames, door hardware, food-pass locks, and steel fixed detention windows. The contractor must install owner-furnished detention furniture and add a dimming switch for the light in Control Booth 110.
- **OEMs and named vendors:** **Simplex** is the required fire-alarm contractor, and **Montgomery Technology Systems** is the County’s security vendor. **STI** fire sleeves are referenced; UL-rated or listed fire/smoke sealing materials may be used instead. **Charm-Tex** is mentioned in connection with detention desks, but the County supplies the detention furniture.
- **Allowances:** $5,000 for a dedication plaque and $200,000 for unforeseen-condition contingency; unused contingency is credited to the County.
- **Notable requirements:** The prime contractor must self-perform at least 15% of physical construction work; this requirement will not be waived. The Security Detention Equipment Contractor is responsible for specification sections 08 34 53 (detention doors and frames) and 08 71 63 (detention door hardware); inclusion of section 08 65 10 (steel fixed detention windows) is encouraged. No specific quantities or part numbers are provided for the construction products.

### Description

Washington County is soliciting bids for Phase 1 of the Detention Center Renovation. The scope includes renovation work detailed in the bid documents, including detention equipment and related building systems; the contractor must self-perform the project’s stated goal, which will not be waived. Bidders must provide a bid bond, performance bond, and labor and material bond, and submit pricing through the online site’s line items tab. A $200,000 contingency allowance for unforeseen conditions is included as a bid line item.

[View original listing](https://washco-md.ionwave.net/PublicDetail.aspx?bidID=532&SourceType=1)