# El Cajon Planet bids #010-27

Broadway Creek Phase B Channel Restoration and Drainage Improvements

**Posted:** October 14, 2026
**Respond By:** November 16, 2026
**Identifier:** 010-27
**NAICS:** 237990, 237310, 238190

The City of El Cajon is seeking a contractor to restore a section of Broadway Creek and improve associated drainage and site features in El Cajon, California.
- **Buyer:** City of El Cajon — Purchasing Division.
- **Project:** Phase B restoration of approximately 450 feet of earthen channel, from the Ballantyne Street undercrossing to Hart Drive.
- **Scope:** Reconstruct channel walls using steel soldier piles, timber lagging, and concrete; install storm-drain piping and catch basins; perform erosion control, landscaping, and irrigation; and complete grading, paving, fencing, traffic control, and related site work.
- **Key quantities:** 215,462 pounds of Corten steel soldier piling; 241 cubic yards of structural concrete for the retaining wall; 54 linear feet of 8-inch PVC storm-drain pipe; 11 precast 24-by-24-inch Brooks Box catch basins; and 399 linear feet of Type CL-8 black vinyl-clad chain-link fence.
- **Notable requirements:** Temporary creek diversion and water-pollution controls are included. The project schedule is estimated at 160 working days, including a 90-working-day plant establishment period.
- **OEMs and vendors:** No OEMs, product manufacturers, or vendors are identified by name.
- **Estimated project value:** $5,200,000.

### Description

The City of El Cajon is seeking bids for restoration of a 450-foot earthen channel from the Ballantyne Street undercrossing to Hart Drive. Work includes reconstructing concrete channel walls using soldier piles, installing a turf reinforcement mat, and constructing catch basins and storm drain pipes discharging to the channel. The project also includes relocating and replacing facilities that conflict with the improvements, cleanup, and other work needed to complete the project in accordance with the bid terms, conditions, and specifications. The estimated value is $5,200,000, and the stated duration is 160 working days.

[View original listing](https://vendors.planetbids.com/portal/14593/bo/bo-detail/147279)