# Western Area Water Supply Authority Questcdn #10366813

Le Sueur Water Treatment Plant Rehabilitation

**Posted:** October 13, 2026
**Respond By:** November 12, 2026
**Identifier:** 10366813
**NAICS:** 236220, 237110, 238210, 238220, 238910, 237990

The City of Le Sueur is soliciting a single construction contract to rehabilitate its existing municipal water treatment plant in Minnesota.
- **Government buyer:** City of Le Sueur, Minnesota; no sub-agency or purchasing office is identified. AE2S is the soliciting agent.
- **Facility:** Existing 2.0-million-gallon-per-day plant of approximately 6,500 square feet.
- **OEMs and vendors:** No equipment manufacturers or product brands are specified. AE2S is named as the soliciting agent, not as an equipment OEM.
- **Requested work and materials:**
  - Rehabilitate four dual-media biological gravity filters, each approximately 145 square feet, including underdrain nozzles and removal and reinstallation of filter media.
  - Provide an induced-draft aerator, 4- to 16-inch process piping, valves, fittings, and related appurtenances.
  - Install on-site chlorine-gas and fluoride chemical-feed systems, including storage and containment.
  - Complete HVAC and other mechanical work, electrical circuits and controls, motor control centers, control panels, instrumentation, conduit, and wiring; provide a standby generator.
  - Perform building construction and rehabilitation, including cast-in-place and precast concrete, brick, and concrete masonry unit work; complete grading, seeding, stormwater basins, and repairs to the existing staging area.
- **Notable requirements:** The work is subject to applicable Minnesota prevailing-wage and Davis-Bacon requirements, Build America, Buy America (BABA), and American Iron and Steel provisions. The project is identified as supported by Drinking Water State Revolving Fund and Congressionally Directed Spending funding.
- **Completion:** Substantial and final completion milestones are scheduled in 2028; no start date, contract duration, option years, or subscription term is specified.

### Description

The project is one contract to rehabilitate the existing 2.0 MGD, 6,500-square-foot Le Sueur Water Treatment Plant. Work includes rehabilitation of four dual-media biological gravity filters, an induced-draft aerator, process piping and valves, chemical feed systems, mechanical and electrical systems, and a standby generator. Sitework includes grading, seeding, stormwater basins, piping appurtenances, and repair of the existing staging area. The project is funded by the Drinking Water State Revolving Fund and Congressionally Directed Spending; Davis-Bacon and Minnesota prevailing-wage requirements, as well as BABA and American Iron and Steel requirements, apply.