# Alberta Purchasing #203680

EPCOR EMS Operator Training and Operational Workflow Development

**Posted:** October 14, 2026
**Respond By:** October 21, 2026
**Identifier:** 203680
**NAICS:** 611430, 541618

EPCOR is seeking a specialist to prepare System Control Centre operators to use its new transmission-focused Energy Management System (EMS).
- **Buyer:** EPCOR; intended users are System Control Centre operators.
- **OEM:** **Schneider Electric**, whose Advanced Distribution Management System (ADMS) is also being upgraded to version 3.11.
- **Requested services:**
  - Develop foundational EMS training on core functions, real-time monitoring and control, switching, alarm management, network visualization, and operating procedures.
  - Create competency assessments to support initial operator qualification.
  - Develop advanced training on contingency analysis, state estimation, load forecasting, and reliability assessment.
  - Prepare EMS-specific operational workflows, procedures, and supporting documentation for EPCOR’s System Control Centre.
- **Notable requirements:** The EMS will not be fully operational while the materials and workflows are developed. The work must draw on Schneider Electric design documents, functional specifications, system requirements, use cases, access to a playpen environment, and relevant implementation experience. Training is intended to support Alberta Reliability Standards requirements.
- **Scope and term:** No equipment quantities or part numbers are specified. The anticipated work period is approximately five months; no option years or annual subscription are specified.

### Description

EPCOR is seeking a proponent to develop a transmission-specific operator training program for its new Energy Management System (EMS), implemented alongside the Schneider Electric ADMS v3.11 upgrade. The work includes foundational EMS training for operator qualification and advanced training on EMS analytical applications, plus related operational workflows, procedures, and supporting documentation for EPCOR’s System Control Centre. Deliverables must be developed using available design documents, specifications, use cases, playpen access, and implementation experience because the EMS will not be fully operational during development. The anticipated work period is November 2, 2026, through March 29, 2027; RFP documents require an NDA to access.

[View original listing](https://purchasing.alberta.ca/posting/AB-2026-06848)
