# New York State Contract Reporter #2139815

DASNY Boiler Replacement, Abatement, Electrical, and Plumbing Work at Hutchings Psychiatric Center

**Posted:** October 14, 2026
**Respond By:** November 19, 2026
**Identifier:** 2139815
**NAICS:** 238220, 238210, 238290, 238910

DASNY is seeking multiple-prime bids to replace boilers and complete related building-system upgrades and hazardous-material abatement at Hutchings Psychiatric Center.
- **Government buyer:** Dormitory Authority of the State of New York (DASNY), New York State; Construction / Construction Contracts Division. Work is at Hutchings Psychiatric Center in Syracuse, Onondaga County.
- **Requested work:** Mechanical scope replaces two boilers and associated piping and includes hazardous-material abatement. Electrical scope replaces boiler-related wiring and equipment. Plumbing scope adds a water heater, expansion tank, thermostatic mixing valve, and RPZ backflow preventer, with copper piping connections, insulation, and required firestopping.
- **Estimated construction costs:** Mechanical, $1.7–$1.9 million; electrical, $130,000–$150,000; plumbing, $200,000–$220,000. Combined estimated range is $2.03–$2.27 million.
- **Products and quantities:** Two boilers; one water heater; one water-heater expansion tank; one thermostatic mixing valve; and one RPZ backflow preventer. Copper piping connections and boiler-related wiring and equipment are also required; no quantities are specified for those items. No product part numbers or project-equipment OEMs are identified.
- **Named vendor:** Camelot Print and Copy Centers is identified as a contract-document distribution and planroom provider, not as a project-equipment supplier.
- **Notable requirement:** Bidders or their principals must have at least five years of similar experience and provide five comparable contracts completed or substantially completed within the preceding ten years.
- **Performance term:** The notice states an end point for the contract term, but does not specify a start date, duration, or option periods.

### Description

DASNY is soliciting bids for multiple prime contracts to replace two existing boilers and associated piping in Buildings 16 and 17 at Hutchings Psychiatric Center, including hazardous-materials abatement. The electrical work includes replacing existing boilers and associated wiring and equipment. The plumbing work includes a new water heater and expansion tank, thermostatic mixing valve, RPZ backflow preventer, copper piping connections, insulation, and required firestopping. The estimated construction cost ranges are $1,700,000–$1,900,000 for mechanical, $130,000–$150,000 for electrical, and $200,000–$220,000 for plumbing.

[View original listing](https://www.nyscr.ny.gov/Ads/Search)
