# Utah Public Procurement Place U3P #DA27013

UDOT Clearwater Office Level 3 Renovation

**Posted:** October 13, 2026
**Respond By:** October 27, 2026
**Identifier:** DA27013
**NAICS:** 236220

UDOT is seeking a general contractor to renovate about 13,000 square feet of office space at its Clearwater Office in Bountiful.
- **Government buyer:** Utah Department of Transportation (UDOT); the State of Utah Department of Administrative Services, Division of Facilities Construction and Management (DFCM), is also identified in project materials. DFCM Project Manager: Aubrey Stapel.
- **Project:** Renovate the Level 3 office area at the Clearwater Office in Bountiful, Utah. The estimated construction cost is **$350,000**.
- **Scope limits:** The work does not include changes to the building core, exits, egress, or restrooms.
- **Design firm:** **HDR** is identified as the project designer. No product manufacturers or OEMs are specified.
- **Site conditions:** The provided pre-renovation survey reports no asbestos in sampled materials and no lead detected in tested project-area materials. Contractors must stop work and notify DFCM if they encounter additional suspect materials.
- **Bidder and subcontractor requirements:** The opportunity is limited to eligible Stage II prequalified general contractors, with a mandatory site meeting. Bidders must provide required first-tier subcontractor information; project materials describe a documented exception when qualified subcontractor bids cannot be obtained.
- **Bonding:** A bid bond of 5% of the bid and performance and payment bonds of 100% of the contract sum are required.
- **Schedule:** Substantial completion is required by the project deadline; no start date or overall duration is stated.

### Description

The Utah Department of Transportation is requesting bids from DFCM Stage II prequalified general contractors for renovation of approximately 13,000 square feet of Level 3 office space at the Clearwater Office in Bountiful, Utah. The work does not include changes to the building core, exiting, egress, or restrooms. The construction cost estimate is $350,000. Only eligible contractors prequalified through Stage I may bid, and attendance at the October 20, 2026 mandatory meeting is required for prime contractors. This is a courtesy posting; UDOT will conduct procurement and contract activity after this posting.

[View original listing](https://utah.bonfirehub.com/opportunities/258399)