# La Vergne Civicplus #ITB #2026-06

Fergus Road Interceptor Sewer construction and site restoration

**Posted:** October 13, 2026
**Respond By:** November 10, 2026
**Identifier:** ITB #2026-06
**NAICS:** 237110, 237310, 237990

The City of La Vergne is seeking a construction contractor for the Fergus Road Interceptor Sewer project in Tennessee.
- **Government buyer:** City of La Vergne, Tennessee; no sub-agency or specific office is identified.
- **Project scope:** Replace about 2,654 linear feet of existing 18-inch gravity sewer and install about 2,620 linear feet of new 21- and 24-inch gravity sewer, manholes, and related appurtenances. The work also includes about 150 linear feet of 36-inch steel casing installed by jack and bore, plus pavement repair and site restoration.
- **Bid-form quantities:** 9 LF of 8-inch PVC; 1,390 LF of 21-inch PVC; 1,230 LF of 24-inch PVC; 23 60-inch manholes; 164 LF of Murfreesboro Road bore; and 12 EA for a bid-form line item labeled “Services,” whose scope is unclear.
- **Additional work:** 2,288 SY parking asphalt repair; 203 SY asphalt repair on Stones River Road; 29 SY asphalt repair at Rutherford Point; 132 SY concrete pavement repair; 6 check dams; 270 LF irrigation replacement; 1,967 SY seed and straw; 25 tons gravel parking repair; 4 tree replacements (Sonic); 2 bank light removals and replacements; and 1 lump-sum erosion-control item.
- **OEMs and vendors:** No OEMs, manufacturers, or construction vendors are specified. CTI Engineering, Inc. is named as the project engineer and source of bidding documents.
- **Notable requirements:** The project includes sewer installation and replacement, road boring, and restoration work. Bid quantities are estimates for comparison, with payment based on actual quantities. The stated project duration is 300 days.
- **Estimated value:** No value is provided in the notice; the range below is a planning estimate only.

### Description

The City of La Vergne is requesting sealed bids for the Fergus Road Interceptor Sewer construction project. Work includes replacing 2,654 linear feet of existing 18-inch gravity sewer and installing 2,620 linear feet of new 21- and 24-inch gravity sewer, manholes, and associated appurtenances. The project also includes 150 linear feet of 36-inch steel casing installed by jack and bore, along with asphalt repair, and has an expected duration of 300 days. Bids are due November 10, 2026, at 2:00 p.m. local time; fax and electronic submissions are not accepted.

[View original listing](https://tn-lavergne.civicplus.com/bids.aspx?bidID=146)