# New Brunswick Opportunities Network #X50-B5A-BW5T33-2

Phase 2 space-allocation construction at the DTI Bathurst District Garage

**Posted:** October 13, 2026
**Respond By:** October 16, 2026
**Identifier:** X50-B5A-BW5T33-2
**NAICS:** 236220, 238160, 238310, 238320, 238390, 238210, 238220

The Government of New Brunswick is seeking Phase 2 space-allocation construction work at the DTI Bathurst District Garage in Allardville.
- **Buyer and project**
  - Government of New Brunswick, through SNB Buildings Construction; project location is the Department of Transportation and Infrastructure (DTI) Bathurst District Garage in Allardville.
- **Construction scope**
  - Building work includes existing conditions, concrete, masonry, wood and composite materials, thermal and moisture protection, openings, finishes, specialties, furnishings, and related mechanical work.
  - Repair an interior trench with cast-in-place concrete meeting the stated strength, aggregate, exposure, air-content, and water-cement requirements.
  - Install a modified-bituminous roofing system, including membrane, insulation, flashing, and mechanical curb-cap work. Select one specified manufacturer system and do not mix products between systems.
  - Remove the existing roof exhaust fan and metal flashing and cap the curb. Remove the exterior hose bibb and piping, and the obsolete exterior propane solenoid valve and piping; close the resulting wall openings.
- **Named OEMs, vendors, and acceptable products**
  - **Valto:** Glasbord fiberglass-reinforced panels (FRP), installed to the underside of the ceiling at 2590 mm.
  - **ROCKWOOL:** Safe’n’Sound interior-partition insulation.
  - **Owens Corning:** QuietZone interior-partition insulation.
  - **Armstrong:** 1754 Fine Fissured High NRC acoustic ceiling tiles, in 2-by-4 format.
  - **Maxxmar, Sol Shade, and ELITE PRO:** acceptable roller-shade options; ELITE PRO Z-300 is specified as an option.
  - **IKO:** M.V.P. Sand vapour retarder and Armourbond Flash Sand membrane are listed roofing products.
  - **Soprema:** Sopra Vapr vapour retarder and Sopraply Stick Duo membrane are listed roofing products.
- **Notable technical requirements**
  - Wall framing includes 20-gauge metal studs; acoustic ceiling tiles are 2-by-4; FRP is installed to the specified ceiling underside.
  - Provide roller shades at the three first-floor windows on the east elevation.
  - The sheet vapour retarder is specified as 0.15 mm polyethylene meeting the referenced standards and limits for vapour permeance and flame spread.
  - Roofing work includes removal of the existing roof exhaust fan and installation of the specified curb cap.

### Description

The solicitation is for Phase 2 space allocation work at the DTI Bathurst District Garage, 3109 Miramichi Ave., Allardville, New Brunswick. The tender includes building-related work across existing conditions, concrete, masonry, wood and composite materials, thermal and moisture protection, openings, finishes, specialties, and furnishings. Addendum 1 revises specifications and drawings, including wall assemblies, ceilings, insulation, roofing, and mechanical items. Bids are accepted only by email as specified in the tender notice, and submissions must include a security deposit equal to 10% of the total bid price.

[View original listing](https://nbon-rpanb.gnb.ca/welcome?language=en)
