# Little Rock Littlerock #IFB-26-75

Construction of the Arkansas Missouri Trail

**Posted:** October 11, 2026
**Respond By:** November 03, 2026
**Identifier:** IFB-26-75
**NAICS:** 237310, 237990

The City of Bentonville is seeking a contractor to build the Arkansas Missouri Trail in Bentonville, Arkansas.
- **Government buyer:** City of Bentonville, Purchasing Department.
- **Scope:** Construct approximately 1,500 linear feet of 10-foot-wide concrete trail, with crossings and connections along the railroad corridor to Martin Luther King Jr. Boulevard and 8th Street.
- **Major work elements:** Trail paving, ramps, curbs and gutters, asphalt and concrete paving, median islands, striping, storm-drainage structures and pipes, tree removal, and railroad-crossing work.
- **Notable crossing:** At Moberly Road, the project may include a pedestrian tunnel or a HAWK-signalized crossing.
- **OEMs and vendors:** No manufacturers, OEMs, or bidding vendors are identified.

### Description

The City of Bentonville is seeking sealed bids from qualified, experienced, licensed, and insured contractors for construction of the Arkansas Missouri Trail. The work includes approximately 1,500 linear feet of trail, with concrete trail, crossings and connections, ramps, curbs and gutters, paving, median islands, striping, and storm drainage; tree removal and railroad crossing work are also included. A bid guarantee of 5% of the total bid price is required, and the awarded bidder must provide performance and payment bonds. The optional pre-bid meeting is scheduled for October 20, 2026, and bids are due before the public bid opening on November 3, 2026, at 11:00 AM CST.

[View original listing](https://classifieds.arkansasonline.com/marketplace/ad/search/query?categoryId=8&searchProfile=notices&source=ad&page=1&size=50&view=list&showExtended=false&startRange=&keywords=&firstDate=10%2F11%2F2026&lastDate=10%2F11%2F2026&ordering=BY_DATE_DEC)
