# City of Fresno PlanetBids #12700465

Fresno Pave More Now Package S-2.1: sidewalk, streetlight, left-turn-lane, and traffic-signal construction

**Posted:** October 09, 2026
**Respond By:** November 10, 2026
**Identifier:** 12700465
**NAICS:** 237310, 238210, 237990

The City of Fresno is seeking a contractor for three coordinated street, sidewalk, and traffic-safety construction projects in Fresno.
- **Government buyer:** City of Fresno, Department of Public Works, Purchasing Division / Purchasing Manager.
- **Opportunity:** Pave More Now Package S-2.1, Bid File 12700465, covering:
  - PW01136: Build sidewalk and install streetlights along Bullard Avenue between Forkner and Van Ness.
  - PW01189: Extend the eastbound left-turn lanes and modify signals at Herndon and Palm avenues.
  - PW01145: Upgrade the Bullard Avenue and Forkner Avenue signal, including protective left-turn phasing, ADA curb ramps, a high-visibility crosswalk, and video detection.
- **OEMs and vendors:** No commercial OEMs, product brands, or bidding vendors are named. The City of Fresno Water Division is identified for its role in the fire-hydrant relocation; the County of Fresno encroachment permit is included in the work.
- **Notable requirements:** Valid California Class A contractor license; compliance with the City Community Workforce Agreement and local-hiring provisions; use of the City’s Construction Management Information System; construction completion within 80 working days after Notice to Proceed. The source also specifies a 10% bid deposit, 100% payment and performance bonds, and liquidated damages of $1,000 per calendar day of delay.
- **Construction allocation:** $2,493,000.
- **Key quantities:** 8,224 square feet of concrete sidewalk across the three projects; 387 square feet of curb ramps; 1,309 tons of Type A hot-mix asphalt; 5,054 cubic yards of roadway excavation; 415 linear feet of reinforced retaining wall; and 20 traffic-signal loops. The complete project-by-project schedule is listed in the line items.

### Description

The City of Fresno is seeking electronic bids for three construction projects: sidewalk and streetlight work on Bullard Avenue, extension of eastbound Herndon Avenue left-turn lanes at Herndon and Palm, and traffic signal and pedestrian-safety upgrades at Bullard and Forkner. Work includes sidewalk construction, streetlights, protective left-turn phasing, ADA curb ramps, a high-visibility crosswalk, and video detection. The construction allocation is $2,493,000. Bids are due November 10, 2026, and the notice requires a valid California Class A contractor’s license, a 10% bid deposit, and 100% payment and performance bonds.

[View original listing](https://vendors.planetbids.com/portal/14769/bo/bo-detail/147096)
