# City of Laredo Ionwave #FY26-ENG-01 Addendum 5

Jefferson Convenience Center Phase 1 construction, including concrete paving, site improvements, fencing, and utility work

**Posted:** August 31, 2026
**Respond By:** October 23, 2026
**Identifier:** FY26-ENG-01 Addendum 5
**NAICS:** 237990, 237110

The City of Laredo is seeking a contractor for Phase 1 construction of the Jefferson Convenience Center in Laredo, Texas.
- **Government buyer:** City of Laredo, Engineering Department; the solicitation also identifies the City Secretary’s Office.
- **Project:** FY26-ENG-01, Jefferson Convenience Center – Phase 1. The work includes reinforced-concrete paving, site preparation, ramps, drainage, fencing, and related site and utility work.
- **Major quantities:** Approximately 72,500–73,200 square feet of 7-inch reinforced concrete, 7,150 square feet of 10-inch reinforced concrete, 7,950 square yards of subgrade preparation, four ADA ramps, 1,000 linear feet of curb and gutter, and eight steel plates. Attachment versions differ on the 7-inch concrete quantity and whether the plates are 12-inch or 18-inch; bidders should follow the final plans and bid documents.
- **Other work:** Clearing and grubbing, demolition and haul-off, shade-structure removal, bollards, valley gutters, a vehicular ramp, erosion-control measures, traffic control, fence and gate work, and possible water, sewer, and underground electrical extensions. The specified sewer extension includes three manholes; the water extension includes a meter and backflow preventer.
- **Notable requirements:** Shade structures must be dismantled, stored, and preserved for future reuse in coordination with the City’s Environmental Department. Structural and reinforcing steel must comply with Build America, Buy America requirements if the project is federally funded. The contractor must coordinate electrical utility work with **AEP**, the existing powerline owner. The bid documents also specify TCEQ-compliant fencing and gates.
- **Named organizations/platforms:** **AEP** is identified as the utility owner; **Cit-E-Bid** is identified as the bid-submission platform. No product OEMs or bidding vendors are specified.
- **Performance period:** 90 working days.

### Description

The City of Laredo is requesting bids for construction of the Jefferson Convenience Center - Phase 1 project. The work includes constructing 72,500 SF of 7-inch heavy-duty reinforced concrete and 7,150 SF of 10-inch reinforced concrete with embedded steel plates, along with curb and gutter, a vehicular ramp with walls, valley gutters, utility line extensions, clearing and grubbing, demolition, ADA driveway ramps, fence removal and replacement, and related work. The stated construction contract time is 90 working days. Bids are due October 23, 2026, at 4:00 PM CT; bidders must provide a bid deposit of at least five percent of the total base bid.

[View original listing](https://cityoflaredo.ionwave.net/PublicDetail.aspx?bidID=4137&SourceType=1)