# Dekalb County School District Ionwave #27-752-819

CM-at-Risk services for Stoneview Elementary School modernization

**Posted:** October 01, 2026
**Respond By:** November 05, 2026
**Identifier:** 27-752-819
**NAICS:** 236220

DeKalb County School District is seeking a construction manager at risk for the Stoneview Elementary School modernization in Lithonia, Georgia.
- **Buyer:** DeKalb County School District, through the DeKalb County Board of Education; Operations Division, Sam A. Moss Service Center, with Procurement Services also identified.
- **Opportunity:** RFQu 27-752-819, Project 355-423. The requested service is preconstruction planning and construction-phase management and delivery under a guaranteed maximum price (GMP).
- **Project scope:** Modernize the school and add a media center and four classrooms. Work includes fire sprinklers, HVAC, roof and electrical upgrades, kitchen renovation with a walk-in cooler/freezer, security and low-voltage systems, interior finishes, doors and windows, site and parking improvements, drainage, playground and courtyard work, a bus-lane canopy, landscaping, and removal of existing modular-classroom infrastructure. The planned school capacity is 750 students and 48 instructional units.
- **Pricing:** The solicitation states a $30 million construction cost limitation and requires the proposed GMP to remain within it. The separate GMP worksheet lists a total construction works/GMP figure of $4,125,000, so the documents contain materially different amounts that proposers should reconcile. The worksheet also identifies allowances for FFE ($900,000), IT ($900,000), furniture moving/storage ($75,000), hazardous-material abatement/testing ($500,000), outdoor classroom ($150,000), emergency-responder radio coverage ($50,000), terrazzo repair ($50,000), and unforeseen conditions ($1,500,000); sanitary-sewer remediation is listed as a possible allowance with amount undetermined.
- **Named OEMs and product brands:** **Centegix** crisis alert system; **Tensar BX 1100** geogrid; and **Treviara #112** geotextile fabric, or equal. No construction-management firm or other prime vendor is named.
- **Notable requirements:** Protect the academic environment and student and staff safety during work. The proposal includes pricing for 16 alternates and specified unit-price work. A bid bond of at least 5% of the proposed GMP, valid contractor and business licenses, insurance documentation, and a bonding-capacity letter are required.
- **Schedule:** Construction is targeted to begin in early 2027, with substantial completion targeted in mid-2029. Final completion is due within 120 days after substantial completion or receipt of the punch list, whichever is later. The documents do not state a fixed overall performance duration.

### Description

DeKalb County School District seeks a qualified firm to provide Construction Management at Risk services for the full modernization of Stoneview Elementary School in Lithonia, Georgia. Work includes preconstruction services such as cost validation, constructability reviews, value engineering, scheduling, and procurement planning, followed by construction services. The stated cost limitation is $30,000,000, and the guaranteed maximum price must not exceed that amount. The scope includes building additions and renovations, replacement of major building systems, and related site improvements; proposals are due electronically by November 5, 2026, at 2:00 PM ET.

[View original listing](https://dekalbschoolsga.ionwave.net/PublicDetail.aspx?bidID=1226&SourceType=1)
