# Port of Portland Planet bids #2026-14655

Portland International Airport upper-roadway joint replacement, pavement and gutter repairs, and bio-based asphalt rejuvenator application

**Posted:** October 07, 2026
**Respond By:** November 03, 2026
**Identifier:** 2026-14655
**NAICS:** 237310

The Port of Portland is seeking a contractor to repair and replace roadway joints and complete related pavement, gutter, and asphalt-rejuvenation work at Portland International Airport.
- **Government buyer:** The Port of Portland — Engineering; Contracts and Procurement; Portland International Airport.
- **Scope:** Replace and repair upper-roadway expansion joints, make localized concrete and pavement repairs, rehabilitate gutters and downspouts, and apply a bio-based asphalt rejuvenator. The bid schedule identifies one lump-sum project line item; product quantities are not provided.
- **Named OEMs and vendors:** **Sika Emseal** (WaboCrete joint system); **BioSpan Technologies** (RePLAY rejuvenator); **Bio Based Spray Systems LLC** (RePLAY and BioRestor rejuvenators); and **Hilti** (HIS-N threaded inserts). These are specified products or manufacturers, not identified bidders; approved equals are allowed where specified.
- **Products and materials:** WaboCrete Membrane Gen II or approved equal; RePLAY for pervious asphalt and RePLAY or BioRestor for impervious asphalt, or approved equals; stainless-steel cover plates; Hilti HIS-N inserts; specified screw anchors, welded wire mesh, reinforcing bar, aggregate base, tack coat, and dense Level 4 hot-mix asphalt concrete (HMAC).
- **Notable requirements:** Rejuvenator must be agriculture-based, made from soy-oil derivatives and polymers, and at least 75% bio-based. It must support a stated 3–5-year pavement life-cycle extension while leaving traffic markings visible. Joint assemblies must accommodate vehicle and pedestrian traffic and seal against air, dust, water, and smoke.
- **Work and access constraints:** Maintain airport operations and roadway access, including at least one open lane; open all lanes at the end of each workday. Work areas have nighttime traffic and access restrictions, and activities affecting the upper roadway or NE Airport Way are limited to no more than five calendar days. Coordinate traffic impacts with Port operations and use an approved traffic-control plan.
- **Other construction requirements:** Clean and water-test designated gutters and downspouts, repair leaks, and adjust gutter slope as directed. Use specified pavement materials and compaction standards; reclaimed asphalt pavement is not allowed in HMAC.

### Description

The Port of Portland is seeking bids for providing and repairing roadway joints on the terminal upper roadway at Portland International Airport. The work also includes providing a bio-based asphalt rejuvenator. Bids must be submitted electronically through the Port’s online bidding system by November 3, 2026, at 2:00 PM. A non-mandatory pre-bid meeting is scheduled for October 14, 2026.

[View original listing](https://vendors.planetbids.com/portal/15598/bo/bo-detail/146793)
