# SAM #W912EK27BA003

Detroit Project Office roads, parking, and grounds renovation

**Buyer:** USACE MVD Rock Island District
**Posted:** October 07, 2026
**Respond By:** November 30, 2026
**Identifier:** W912EK27BA003
**NAICS:** 237310, 237990, 238910, 238110, 238190

The U.S. Army Corps of Engineers is planning a comprehensive roads, parking, and grounds renovation at its Detroit Project Office in Wayne County, Michigan.
- **Government buyer:** U.S. Army Corps of Engineers, Mississippi Valley Division, Rock Island District (W07V ENDIST Rock Island).
- **Scope of work:** Demolish asphalt and concrete pavement, curbs, gutters, sidewalks, slabs, water and storm sewer infrastructure, fencing, gates, and a flagpole; perform earthwork and grading; install or improve water mains and storm sewers; and place aggregate and new asphalt and concrete paving.
- **Site improvements:** Construct sidewalks, steps, and light pole bases; install handrails, ornamental fencing, an electric pivot gate, pipe bollards, and a flagpole; complete pavement markings, turf repair, seeding, and site restoration.
- **Electrical and access systems:** Install conductors, a utility rack, gate controls, keypad, intercom, camera, monitoring station, and exterior pole lighting.
- **OEMs and vendors:** No OEMs, vendors, product models, part numbers, or product quantities are identified.
- **Completion period:** 365 consecutive calendar days; no start or end date is specified.

### Description

Pre-Solicitation - W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation      Completion Days:  365 Consecutive Calendar Days        NAICS 237310         8(a) Competitive IFB       The project includes, but is not limited to mobilization and demobilization; demolition to include removal of asphalt and concrete pavements, curbs and gutters, sidewalks and slabs, water main, valve and hydrant, storm sewer inlets, manholes and pipe, chain-link and ornamental fencing and gates, and flagpole; earthwork to include stripping, excavation, placement of backfill, compaction, and grading; water main and storm sewer work; aggregate work; asphalt paving; concrete paving, sidewalks, steps and light pole bases; installation of new metal handrail; installation of new ornamental fencing and electric pivot gate; electrical work to include installation of new conductors, new utility rack, new electric gate controls with keypad, intercom, camera and monitoring station, and new exterior pole lighting; installation of new pipe bollards;installation of new flag pole; pavement markings; damaged turf repair; seeding; and site restoration. ETA for IFB is within 30-60 days. <br/><br/><br/><strong>Additional Links:</strong><br/><a href='https://toolbox-piee.eb.mil/' target='_blank'>Department of Defense Procurement Toolbox</a><br/><a href='https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912EK27BA003&noticeType=Presolicitation' target='_blank'>PIEE Solicitation Module Link for W912EK27BA003</a><br/><a href='https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf' target='_blank'>Registration Instructions for the PIEE Solicitation Module</a><br/><a href='https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml' target='_blank'>Web Based Training for the PIEE Solicitation Module</a>