# Pierce County Opengov #2026-MPW-241

Orangegate Park Phase 1 construction, park facilities, trails, utilities, and Landscape Structures playground equipment

**Posted:** October 07, 2026
**Respond By:** November 04, 2026
**Identifier:** 2026-MPW-241
**NAICS:** 237990, 236220, 237310, 238910, 238990, 237210

Pierce County is seeking a contractor to build Phase 1 of Orangegate Park, including park facilities, playground equipment, trails, utilities, and site improvements.
- **Government buyer:** Pierce County Parks and Recreation, with procurement conducted by Pierce County Public Works, Procurement & Contract Services.
- **Project location and scale:** Approximately 40 acres in Tacoma, Washington.
- **Estimated value:** $6 million–$6.7 million, excluding sales tax.
- **OEMs named:** **Landscape Structures** playground equipment; **Romtec, Inc.** restroom and pavilion packages, or approved alternates.
- **Major work:** Parking, an ADA-accessible playground, off-leash dog area, picnic shelters, restroom/maintenance building, trails, pedestrian crossing, trail connections, utilities, stormwater facilities, lighting, landscaping, and related site work.
- **Specified playground products:** Landscape Structures equipment includes Forma Alpine Slide (307427A), OmniSpin Spinner (173591A), We-Go-Round (249558A), We-saw (186490A), and the additional scheduled components listed below.
- **Bid alternates:** Picnic Shelter 1; off-leash-area loop trail and clearing; split-rail fence along 84th Street East; contractor-furnished directional and large trail-entry signs for owner installation.
- **Notable requirements:** Accessibility, stormwater treatment and flow control, archaeological monitoring and inadvertent-discovery procedures in the designated area, coordination with authorities and Pierce County Parks’ Natural Lands Team, and replacement of removed trees at least 6 inches in diameter at breast height. The project requires at least 15% apprentice labor hours; specified construction safety requirements also apply.
- **Schedule:** Substantial completion within 310 calendar days after notice to proceed, followed by up to 30 additional days for final completion and acceptance.

### Description

Pierce County is soliciting bids for Phase 1 development of approximately 40 acres of Orangegate Park North. Work includes a parking lot, restrooms, covered shelters, a playground, trails, and associated utilities, infrastructure, and other elements shown in the contract documents. The project plans also describe bioswales and wetland areas, an off-leash dog park, and a safe pedestrian crossing and trail connection. Bids must be submitted electronically through OpenGov; the listed estimate is $6,000,000–$6,700,000, excluding Washington State sales tax.

[View original listing](https://procurement.opengov.com/portal/piercecountywa/projects/309995)
