Clemson University’s University Facilities - Utility Services is seeking a provider to maintain and expand its campus building automation systems.
- **Buyer and opportunity:** Clemson University, University Facilities - Utility Services; solicitation 8366AP, serving university facilities in South Carolina.
- **Core platform and OEM:** **Johnson Controls (JCI)** Metasys is the existing campus-wide building automation and energy management platform. The provider must support and integrate with the existing system, including installations, upgrades, expansion, software support, and energy-management functions.
- **Other named manufacturers:** Air Monitor Corp., Tek-Air, Ruskin, Dietrich Standard, MSA Instruments, Critical Environments Technologies, Sherlock, and Onicon. Johnson Controls products named in the specifications include VG1000 Series ball valves, VF Series butterfly valves, and AD-1250 or AD-1251 airflow measuring systems. Equivalent products may be allowed where specified; device quantities are not provided.
- **Existing system scale:** The campus system includes one Metasys Version 16.0 ADX server, 82 NAEs, and 105 SNEs, plus other components. The requested work includes BAS and HVAC monitoring, troubleshooting, calibration, commissioning, and support for new or expanded systems.
- **Priced annual services:** Enterprise BAS specialist, 2,000 hours; Metasys BAS and maintenance technician, 400 hours; optional dispatched repairs, 50 hours; project manager, 40 hours; system application engineer, 40 hours; system technician, 90 hours; system BAS technician, 40 hours; HVAC mechanic, 40 hours; and chiller mechanic, 40 hours.
- **Other priced services:** Optional 24/7 remote critical-alarm monitoring and response and remote diagnostics, each priced per building per year; latest JCI Metasys version subscription and annual installation support; Operator Training I, three days; Operator Training II, five days; maintenance personnel training, two days; and system administration training, five days. Operator training is for up to 10 people. The bid schedule also uses $50,000 comparison allowances for markup on third-party materials/components and non-Control Company services/personnel; these are not product prices or spending caps.
- **Additional scope:** 24/7 technical support, optional remote monitoring of up to 300 critical facilities, controls commissioning and training, project planning and sales engineering, and project documentation. Emergency repair requests require a response within two hours. Additional repairs require Clemson’s authorization.
- **Notable qualifications and integration needs:** The enterprise specialist is planned for 40 hours per week over 50 weeks, must obtain Accredited Commercial Energy Manager certification within the first year, and must hold Master Factory Trained Controls Technician certification. The BAS must integrate with Metasys and support BACnet/TCP/IP communications. No quantities are specified for the named sensors, transmitters, valves, or airflow devices.

### Description

Clemson University is soliciting a contract for installation, implementation, technical service, and support of its existing Johnson Controls Metasys Building Automation Systems, including energy management, monitoring, and building controls at University facilities in South Carolina. The scope includes maintaining and supporting the existing system and providing new installations, upgrades, and system expansion. The awarded vendor will also provide BAS services for construction and renovation projects performed directly for Clemson or by other contractors. Proposals must be submitted online and include the completed bidding schedule.