# C.E. Gleeson Constructors Inc. Procureware #E26-216

35,805-Square-Foot Club Studio Tenant Build-Out

**Posted:** October 06, 2026
**Respond By:** October 23, 2026
**Identifier:** E26-216
**NAICS:** 236220, 238220, 238210, 238290, 238310, 238320, 238350, 238990

C.E. Gleeson Constructors, Inc. is seeking bids for a 35,805-square-foot Club Studio tenant build-out in Buffalo Grove, Illinois.
- Buyer and project
  - Buyer: C.E. Gleeson Constructors, Inc.; the notice does not identify a government agency as the buyer.
  - Project: Build-out of a new Club Studio fitness facility in Lake County, Illinois.
- Named OEM/vendor
  - CryoBuilt is specifically named for condenser piping associated with the cryotherapy scope.
- Requested construction, products, and systems
  - Selective demolition and concrete removal, followed by concrete, masonry, structural steel, metal framing, carpentry, and millwork work.
  - Building-envelope materials and work, including insulation, air barriers, roofing repairs, firestopping, doors, windows, glazing, and hardware.
  - Interior finishes and specialties, including flooring, ceilings, wall finishes, sound-absorbing panels, lockers, toilet accessories, signage, and fire-extinguisher cabinets.
  - Equipment and furnishings, including a boxing-bag support structure, laundry equipment, towel sensor, floor mats, window shades, moss and green walls, and drapery.
  - Special construction and systems, including saunas, fire alarm, electronic article surveillance, and owner-designated cryotherapy rooms.
  - Mechanical, plumbing, and fire-protection work, including rooftop air-conditioning units, terminal heating and cooling units, fans, plumbing fixtures, water heaters, and CryoBuilt condenser piping.
  - Electrical and low-voltage scope, including distribution equipment, lighting, wiring, and low-voltage/CCTV conduit.
  - No part numbers or item quantities are provided in the notice.
- Notable requirements and alternates
  - Price an alternate to furnish architectural millwork designated “By Owner” and install that millwork.
  - Price installation of owner-furnished audio equipment and owner-furnished camera and microphone equipment.
  - Include testing, adjusting, and balancing of mechanical systems.
- Period of performance
  - Project duration is 210 days. The notice provides no separate end date or option periods.

### Description

The solicitation is for a tenant build-out of a new 35,805-square-foot Club Studio. The scope includes selective demolition, concrete, masonry, metals, carpentry, finishes, specialties, equipment, furnishings, mechanical, and electrical work, among other listed divisions. Owner-requested alternates include furnishing or installing owner-designated architectural millwork and installing owner-furnished audio, camera, and microphone equipment. Bids are to be emailed to estimating@gleesonconstructors.com; the anticipated construction start is December 1, 2026, and the project duration is 210 days.

[View original listing](https://gleesonconstructors.procureware.com/Bids/ea345f75-671e-414b-9bab-fef774ddbd5d)
