# New York State Contract Reporter #2139631

Phase 2 ADA upgrades at SUNY Erie Community College’s City Campus

**Posted:** October 07, 2026
**Respond By:** October 21, 2026
**Identifier:** 2139631
**NAICS:** 236220, 238990

Erie County Department of Public Works is seeking bids for Phase 2 ADA upgrades at SUNY Erie Community College’s City Campus in Buffalo.
- **Government buyer:** Erie County Department of Public Works; the work is at SUNY Erie Community College’s City Campus. No sub-agency or office is identified.
- **Project and vendor names:** SUNY ECC City Campus Phase 2 Various ADA Upgrades Project, ECDPW Project No. 2022-955-01; advertised by Picone Construction Corp.
- **OEMs:** No manufacturers, OEMs, product brands, or named product vendors are specified.
- **Requested work:** Selective demolition (02 4119); asbestos abatement (028200); lead-based paint work (028300); architectural millwork (064416); thermal insulation (072100); joint sealants (079200); metal doors and frames (081213); wood doors (081416); access doors and door hardware (083113); drywall and non-structural metal framing (092216); gypsum board (092900); ceramic tile (093013); acoustical panel ceilings (095113); resilient base and accessories (096513); resilient tile flooring (096519); carpeting and carpet tiles (096813); painting (099123); plastic toilet compartments (102113); and toilet accessories (102800).
- **Notable requirements:** Account for alternates G-01 and G-02. Prevailing wages apply, and the project is tax-exempt. Participation goals are 6% SDVOB, 17% MBE, and 13% WBE.
- **Performance period:** 200 days; specific start and end dates are not stated.

### Description

This is a prime-contractor opportunity seeking qualified subcontractors and/or suppliers for the SUNY ECC City Campus Phase 2 Various ADA Upgrades Project. The scope includes selective demolition, asbestos abatement, lead-based paint work, insulation, doors and hardware, drywall, flooring, painting, and toilet accessories, among other work; the notice asks bidders to note ALT G-01 and ALT G-02. The contract term is 200 days, with prevailing wages and tax-exempt status. Contracting goals are 6% SDVOB, 17% MBE, and 13% WBE; bid documents are available by contacting mglomb@piconeconstruction.com.

[View original listing](https://www.nyscr.ny.gov/Ads/Search)
