# SAM #36C25727Q0033

VA steam-trap replacement, wireless monitoring, and maintenance services

**Buyer:** VA Contracting Office 17
**Posted:** October 05, 2026
**Respond By:** November 04, 2026
**Identifier:** 36C25727Q0033
**NAICS:** 238220, 221330

The Department of Veterans Affairs is seeking a contractor to replace and monitor steam traps at the Dallas VA Medical Center Campus.
- **Government buyer:** Department of Veterans Affairs, Central Texas Veterans Health Care System, Network Contracting Office 17; Contracting Officer: Mr. Shawn R. Reinhart.
- **Scope:** Survey, tag, test, and establish an energy baseline for approximately 673 steam traps, then replace the verified population with standardized quick-change trap stations during the base period.
- **Products and quantities:** Trap station replacements for 1/2- and 3/4-inch traps (1 line item); replacements for 1-inch-and-larger traps (1 line item); wireless transmitters (1); repeaters (1); and gateways/data interfaces (1). These are line-item quantities; the notice does not provide equipment counts or part numbers.
- **Services:** Continuous wireless monitoring, alerts and transmitter battery maintenance; semiannual preventive maintenance and dual-method testing; post-standardization trap module changeouts; monthly, quarterly, and annual reporting and data delivery; and authorized steam-system repairs under a not-to-exceed allowance.
- **Notable requirements:** Monitoring equipment must operate without connection to the VA network. Data exports must be machine-readable and unedited. The solicitation identifies no OEMs, vendors, or specific product part numbers.
- **Set-aside:** Verified Service-Disabled Veteran-Owned Small Businesses (SDVOSBs).

### Description

<p>&shy;&shy;&shy;The Contractor shall provide all labor, supervision, management, materials, equipment, tools, transportation, permits, and incidentals necessary to: Survey, tag, and baseline the entire steam trap population; Replace one hundred percent (100%) of the verified trap population with quick-change trap-station assemblies; Furnish, install, commission, monitor, and maintain a continuous wireless steam trap failure monitoring system covering 100% of the replaced traps; Perform semiannual preventive maintenance (PM) and testing of all trap stations; and Perform repair and replacement of steam traps and associated steam distribution components IAW PWS.</p>

[View original listing](https://sam.gov/opp/32225955533b4deaaf9981cc9af191c7/view)
