# Alberta Purchasing #P-005162

McCaig Tower Surgical Space Construction and Hospital Systems Upgrades

**Posted:** October 02, 2026
**Respond By:** November 05, 2026
**Identifier:** P-005162
**NAICS:** 236220, 238210, 238220

Alberta Infrastructure is seeking construction and renovation services for surgical and clinical spaces at FMC’s McCaig Tower as part of the Alberta Surgical Initiative.
- **Government buyer and location**
  - Buyer: Alberta Infrastructure.
  - Project site: FMC’s McCaig Tower; no more specific sub-agency or office is identified.
- **Requested services and quantities**
  - Connect a new medical vacuum system to the existing hospital system.
  - Renovate third-floor clinical engineering space.
  - Develop fifth-floor space for 11 operating rooms: 2 interventional, 2 isolation, 1 airborne-isolation, and 6 general; also create 17 post-anesthetic care spaces and 5 pre-operative spaces.
  - Develop sixth-floor mechanical and electrical interstitial space, including 11 dedicated operating-room air handling units.
  - Install 1 air handling unit on the eighth floor.
  - Complete facility-wide clinical, mechanical, and electrical upgrades, including infrastructure tie-ins, testing, balancing, commissioning, and turnover.
- **OEMs and vendors**
  - No OEMs, product vendors, or named suppliers are identified.
- **Notable project requirements**
  - Work must integrate with existing hospital infrastructure and accommodate required system shutdowns.
  - Bid security is required, and bid documents must be completed in full. A site walk is available but optional.

### Description

The project involves construction and renovations at McCaig Tower and related work at the hospital for the Alberta Surgical Initiative. Scope includes a basement medical vacuum tie-in, a clinical engineering renovation on the 3rd floor, and development of shelled space on the 5th floor for 11 operating rooms, 17 post-anesthetic care spaces, and 5 pre-operative spaces. Work also includes Level 6 mechanical and electrical interstitial space, a new air handling unit on the 8th floor, and upgrades and tie-ins to existing clinical, mechanical, and electrical systems. Required activities include shutdowns, testing, balancing, commissioning, and turnover.

[View original listing](https://purchasing.alberta.ca/posting/AB-2026-06658)
