# El Reno Civicplus #RFQ No. 27-001

CMAR services for two new El Reno Regional Airport hangars

**Posted:** October 02, 2026
**Respond By:** October 20, 2026
**Identifier:** RFQ No. 27-001
**NAICS:** 236220

The El Reno Airpark Authority is seeking a construction manager at risk to deliver two new aircraft hangars at El Reno Regional Airport.
- **Government buyer:** El Reno Airpark Authority, under the City of El Reno; office: El Reno Airpark Authority. Located in El Reno, Canadian County, Oklahoma.
- **Requested services:** One CMAR engagement for preconstruction and construction-phase services under a Guaranteed Maximum Price structure. Work includes design review, planning, scheduling, estimating and cost control, value engineering, constructability review, bid-package development, procurement coordination, construction administration, and closeout.
- **Project scope:** Two aircraft hangars, Hangars 5 and 6, anticipated at approximately 9,696 square feet each. The anticipated total project budget is $2,000,000; this is the project budget, not a stated CMAR fee.
- **Notable requirements:** Assess salvaged materials from former Hangar 1 for practical reuse and preserve its architectural character. Coordinate construction with airport operations and provide quality, safety, security, commissioning, closeout, and warranty coordination.
- **OEMs and vendors:** No product manufacturers, OEMs, or commercial vendors are named. No products or product part numbers are requested.
- **Performance:** Preconstruction follows notice to proceed and continues through approval of the applicable GMP amendment; construction services continue through project closeout. Completion is desired by the end of 2027.
- **Eligibility:** The CMAR must maintain current registration with the Oklahoma Office of Management and Enterprise Services as required by state law.

### Description

The El Reno Airpark Authority is seeking qualifications from firms to provide construction manager at risk services for new aircraft Hangars 5 and 6 at El Reno Regional Airport. The project anticipates two approximately 9,696-square-foot hangars, with practical reuse of materials from the former Hangar 1 and preservation of its architectural character. Services include preconstruction and construction support such as design review, scheduling, cost estimating, value engineering, procurement coordination, and construction administration under a Guaranteed Maximum Price structure. The anticipated total project budget is $2,000,000, and the desired completion date is on or before December 31, 2027.

[View original listing](https://www.elrenook.gov/bids.aspx?bidID=34)
