# Georgia Procurement Registry #PE-70910-NONST-2026-000000005

Turnkey irrigation-system expansion for Oglethorpe County recreation fields

**Posted:** October 02, 2026
**Respond By:** November 02, 2026
**Identifier:** PE-70910-NONST-2026-000000005
**NAICS:** 238990, 238210

Oglethorpe County is seeking a turnkey expansion of irrigation at its recreation fields in Crawford, Georgia.
- Buyer: Oglethorpe County Board of Commissioners; project site is the Oglethorpe County Recreation Department.
- Scope: One fixed-price contract to expand irrigation in the softball, utility, baseball, and mainline areas, including installation, electrical and control work, testing, programming, commissioning, and site restoration.
- **Named OEMs:** **Rain Bird** equipment includes quick-coupling valves, electric valves, rotors, a valve key, and a hose swivel. **Hunter** equipment includes the controller and wireless control components. Specified products allow approved equals; EZ Long Range Decoders also allow approved equals.
- Quantity highlights: 2,600 LF of 3-inch Schedule 40 PVC; 2,600 LF of 2-inch Class 200 PVC; 3,200 LF of 1-inch Class 200 PVC; Rain Bird 200PGA valves (16), 100PGA valves (2), I-20 rotors (29), and Falcon rotors (52); and 9 Hunter single-station wireless valve links.
- The contractor must evaluate the existing pump and provide a compatible pump-house tank and pressure-switch/control assembly. Work also includes permits and utility coordination, trenching, piping, restoration of playing surfaces with compatible sod and other disturbed turf with compatible seed and straw, and project closeout documents.
- Performance requirements: complete the work within 30 calendar days after Notice to Proceed and provide at least a one-year warranty after final acceptance.

### Description

Oglethorpe County is seeking sealed bids for a turnkey expansion of the irrigation system at its Recreation Department in Crawford, Georgia. Work includes labor, materials, equipment, permits, trenching, piping, irrigation components, electrical and control work, testing, restoration, and installation of a compatible pump-house tank and pressure-switch/control assembly. A mandatory pre-bid walkthrough is required, and the selected contractor must complete the work within 30 calendar days after notice to proceed and provide a minimum one-year warranty. The bid packet states that no bid, performance, or payment bonds are required.

[View original listing](https://ssl.doas.state.ga.us/gpr/eventDetails?eSourceNumber=PE-70910-NONST-2026-000000005&sourceSystemType=gpr20)
