# Beaumont County Ionwave #PW1027-03

Beaumont Citywide Phase VII Street Rehabilitation Construction

**Posted:** October 01, 2026
**Respond By:** October 22, 2026
**Identifier:** PW1027-03
**NAICS:** 237310

The City of Beaumont is seeking a contractor for its citywide Phase VII street rehabilitation project, an estimated $8.9 million construction effort.
- **Buyer:** City of Beaumont, Texas — Public Works, Public Works / Engineering.
- **Project:** Street Rehabilitation Citywide – Phase VII (PW1027-03), covering streets across Beaumont, including work shown for Wards 1–4.
- **OEMs and vendors:** No OEMs, manufacturers, or vendors are identified; the procurement is for construction services and materials rather than named branded products.
- **Major work and estimated quantities:** roadway preparation (642 STA); remove concrete curb and gutter (523 LF); cement-treat existing material, 8–10 inches (140,271 SY); Type D, PG 64-22 hot-mix asphalt, 1.5-inch wearing surface (11,995 TON) and level-up course (11,876 TON); flexible pavement repair with 8-inch asphalt-stabilized base (1,059 SY); pavement planing, 1–3 inches (3,530 SY), including skid-steer-mounted work (6,982 SY); Type II, 6-inch concrete curb and gutter (523 LF); asphalt-concrete intersections, driveways, and turnouts (1,762 TON); and joint/crack cleaning and sealing (15,400 LF).
- **Other bid items:** mobilization (1 LS); barricades, signs, and traffic handling (12 MO); Type I reflective pavement markings—yellow 6-inch solid (4,554 LF), yellow 6-inch broken (1,010 LF), white 24-inch solid (10 LF), and white 8-inch solid (90 LF); and Type C white arrow prefabricated pavement markers (2 EA).
- **Notable technical and delivery requirements:** cement treatment specifies 6% Cem-Lime or cement slurry by weight; the asphalt level-up course uses PG 64-22 binder and does not permit grade bumping; and joint/crack sealing specifies Class 3 hot-poured rubber sealant. Work must follow applicable City and TxDOT requirements, coordinate with utilities and affected residents, maintain traffic flow and property access, and address permits, stormwater, erosion control, and restoration. Barricades, signs, and traffic handling are capped at $5,000 per month; mobilization is capped at 5%.
- **Schedule:** The contract period is 365 calendar days from the commencement date stated in the Notice to Proceed. Downs Road, Avie Lane, Amelia Street, and Old Voth Road are to be rehabilitated at the end of the construction period, in that order.

### Description

The City of Beaumont is requesting bids for construction of Street Rehabilitation Citywide - Phase VII. The work includes furnishing the plans, administration, superintendence, labor, services, materials, tools, equipment, supplies, transportation, utilities, and other items and facilities necessary to complete the construction under the Contract Documents. A mandatory virtual pre-bid conference is scheduled for October 15, 2026. The estimated value is $8.9 million, and bids are due October 22, 2026.