# Texas DIR/ESBD #RFQ 26-19912-TF

Lubbock Stormwater Planning, Engineering, Restoration, and Construction-Phase Services

**Posted:** September 30, 2026
**Respond By:** October 01, 2026
**Identifier:** RFQ 26-19912-TF
**NAICS:** 541330, 541370, 237990, 237110, 541320

The City of Lubbock is seeking qualified professional firms for stormwater planning, engineering, restoration, and construction-phase work.
- **Government buyer:** City of Lubbock, Texas — Purchasing and Contract Management Office.
- **Requested services:**
  - Watershed boundary and drainage studies to identify stormwater issues and prioritize improvements, including drainage analysis reports, FEMA mapping, and Community Rating System (CRS) studies.
  - Design and construction of stormwater system improvements identified through those studies.
  - Playa and Canyon Lake restoration assessments to determine capacity loss and restoration needs related to development and accumulated sediment.
  - Additional work may include master drainage plans, watershed studies, hydrologic and hydraulic (H&H) modeling, stormwater-quality best management practices, regional detention facilities, flood-mitigation studies, and construction-phase stormwater compliance.
- **Named platform:** Stormwise (ICPR) is identified for H&H modeling. No manufacturer or vendor is clearly identified in the provided materials.
- **Qualifications sought:** Firms should demonstrate relevant expertise across the service areas and provide project examples and references. The City may shortlist up to five firms; project scopes and funding will be determined as needs arise.
- **Performance period:** No fixed term is stated. Services will be established on a project-by-project basis.

### Description

The City of Lubbock is seeking qualifications from firms to provide stormwater professional services, including analysis, modeling, design, and construction-phase services. Work may include watershed and drainage studies, stormwater system improvements, playa and canyon lake restoration, master drainage plans, flood mitigation studies, and stormwater compliance. Firms will be ranked in three service areas, with project tasks and funding determined separately; selection does not guarantee a specific amount of work or compensation. Responses are due through Bonfire by October 1, 2026, at 2:00 p.m.

[View original listing](https://www.txsmartbuy.gov/esbd/RFQ26-19912-TF)
