# El Paso Water Ionwave #CSP46-26 Addendum 2

Rehabilitate 12 wells and install and maintain pumping systems for El Paso Water

**Posted:** September 04, 2026
**Respond By:** October 07, 2026
**Identifier:** CSP46-26 Addendum 2
**NAICS:** 237110, 221310

El Paso Water is seeking proposals to rehabilitate 12 wells and install and maintain their pumping systems.

### Description

EP Water is soliciting a competitive sealed proposal for rehabilitation work at twelve existing El Paso Water wells. The scope includes furnishing and installing well pumps, motors, soft starter/VFD motor controllers, and associated equipment, with an allowance for urgent well repairs and possible pump and appurtenance work at existing booster stations. The project is estimated to take 18 months; the source lists an engineer estimate of $7,948,800.00–$9,052,800.00. Proposals are due October 7, 2026, at 1:30 PM MT, and may be submitted electronically through Ion Wave, by hard copy, or both; the original bid bond is due before bid opening.

[View original listing](https://epwater.ionwave.net/PublicDetail.aspx?bidID=407&SourceType=1)
