# SAM #W912DQ26QA080

Supply and Optional Installation of Debris Boom System at Harry S. Truman Dam

**Buyer:** USACE Kansas City District
**Posted:** September 28, 2026
**Respond By:** October 26, 2026
**Identifier:** W912DQ26QA080
**NAICS:** 332312, 332999, 238990, 333318, 237990

This opportunity from the U.S. Army Corps of Engineers, Kansas City District, seeks a contractor to supply and optionally install a debris boom system at Harry S. Truman Dam in Missouri.
- Government Buyer:
  - U.S. Army Corps of Engineers, Kansas City District (ENDIST KANSAS CITY CONTRACTING DIV CORPS OF ENGINEERS)
- OEMs and Vendors:
  - No specific OEMs or vendors are named; the boom must be USA-made
- Products/Services Requested:
  - Debris Boom System and Anchors (CLIN 0001)
    - Approximately 2,000 feet long, minimum 24-inch diameter float sections
    - Highly visible color, frost-proof, UV-stable, corrosion and rot-resistant
    - Includes a 20-foot wide boat gate with latching mechanism and a removable 40-foot wide section for equipment access
    - Designed for a 45-year service life
    - Must withstand direct impact from an 18-inch-diameter, 100-foot-long log at maximum water velocity
    - Designed for 50 mph wind speed, 5-foot wave height, and an 800-foot-long by 3-foot-thick debris field
    - Minimum safety factor of 2.0 for design loads
    - Warranty of at least 5 years from final acceptance
  - Delivery of Debris Boom and Anchors (CLIN 0002)
  - Optional Installation of Debris Boom and Anchors (CLIN 0003)
    - Includes all labor, tools, materials, supervision, mobilization, installation, quality assurance, and demobilization
- Unique/Notable Requirements:
  - USA-made requirement for the boom system
  - Highly visible, frost-proof, UV-stable, corrosion and rot-resistant materials
  - Removable sections for equipment access and boat gate for navigation
  - Strict durability and impact resistance specifications
  - Detailed submittals and quality assurance required
  - Warranty of at least 5 years
- Quantities:
  - 1 debris boom system (approx. 2,000 feet)
  - 1 delivery
  - 1 optional installation

### Description

<p>The purpose of the debris boom is to prevent floating debris from impacting the dam&#39;s tainter gates, which is crucial for maintaining the full operational capacity of the spillway. The boom will also serve as a visual barrier to boaters. The Contractor shall provide all labor, materials, equipment, engineering, fabrication, delivery, and optional installation necessary to furnish a complete debris boom system at Harry S. Truman Dam. The approximately 2,000-foot boom shall be designed to intercept floating debris upstream of the spillway and withstand site-specific hydraulic, wind, wave, debris, and impact loading conditions. The debris boom shall be designed for an 800-foot-long by 3-foot-thick debris field, use a minimum safety factor of 2.0 for design loads, withstand a direct head-on impact from an 18-inch-diameter, 100-foot-long log traveling at the maximum design water velocity, and withstand design conditions including 50 mph wind speed and 5-foot wave height.</p>

<p>This acquisition is not set-aside for small business concerns and is competed as full and open competition, Unrestricted.</p>

<p>An organized site visit has been scheduled for: Friday, 9 October 2026 at 11am.&nbsp;</p>

[View original listing](https://sam.gov/opp/ef3a7c8b92a142ba9378ee3b2c161eb0/view)
