# Santa Clara County Biddingo #RFSQ-FAF-FY27_263-CP25006-5

Prequalification for Prime Contractors: SCVMC Bldg. K & M NPC 4/5 Underground Storage Tank & Site Improvement Project

**Posted:** September 25, 2026
**Respond By:** October 14, 2026
**Identifier:** RFSQ-FAF-FY27_263-CP25006-5
**NAICS:** 237110, 237990, 238910

This opportunity involves prequalifying prime contractors for a major site improvement and underground storage tank project at Santa Clara Valley Medical Center (SCVMC) Buildings K and M.
- Government Buyer:
  - County of Santa Clara
  - Santa Clara Valley Medical Center (SCVMC)
- Scope of Work:
  - Seismic anchorage of non-structural components and equipment
  - Seismic bracing of utility services
  - Installation of onsite wastewater tanks with filtration and treatment systems
  - Provision of holding tanks for sewage and liquid waste
  - Detailed site surveys and development of as-built records per HCAI’s A13 Advisory Guide
  - Coordination with hospital and HCAI for construction sequencing and milestones
- Requirements:
  - Compliance with Senate Bill No. 1953 and CAC Chapter 6, Article 11
  - Prequalification is mandatory for contractors wishing to bid
  - County may modify process or scope at its discretion
- OEMs and Vendors:
  - No specific OEMs or vendors are mentioned in the solicitation
- Products/Services Requested:
  - Seismic anchorage and bracing services
  - Wastewater tank installation and site improvement services
- Unique/Notable Requirements:
  - Strict compliance with healthcare facility seismic and safety regulations
  - As-built record development per HCAI standards
  - Coordination with hospital operations during construction

### Description

The County of Santa Clara requires prime contractors to be prequalified before submitting proposals for the SCVMC Bldg. K NPC 4, Bldg. M NPC 4, NPC 5 Underground Storage Tank Project. The project includes seismic anchorage of non-structural components, seismic bracing of utility services, addition of onsite wastewater tanks with filtration and treatment systems, and holding tanks for sewage/liquid waste. Work must comply with Senate Bill No. 1953 and CAC Chapter 6, Article 11, and involves detailed site surveys, as-built record development, and coordination with hospital and HCAI for construction sequencing. The prequalification list will be used for one year to solicit the project, with the County reserving rights to modify the process or scope.

[View original listing](https://biddingousa.com/santaclaracounty/bid/1/41284411/40419228/verification)
