# Foothill-De Anza Community College District Planet bids #1984-519

Roof Replacement for Student Housing Buildings 5 & 7 at Foothill-De Anza Community College District

**Posted:** September 25, 2026
**Respond By:** October 20, 2026
**Identifier:** 1984-519
**NAICS:** 238160

This opportunity involves a major roof replacement project for Student Housing Buildings 5 and 7 at Foothill-De Anza Community College District.
- Government Buyer:
  - Foothill-De Anza Community College District, Purchasing Services
- Scope of Work:
  - Removal of existing roofing systems down to the deck
  - Installation of a new high-performance 80 mil fleece-backed thermoplastic single-ply membrane roofing system
  - Remediation of lead-containing materials:
    - Silver foil on exhaust flues (Building 5)
    - Assumed lead-painted metal parapet caps (Building 7)
  - Inspection and repair or replacement of roof decking and rafters
  - Installation of tapered isocyanurate insulation, coverboard, crickets, new louvers, vents, and all required perimeter and projection flashings
  - All work must comply with manufacturer and regulatory requirements
- Products & Quantities:
  - 80 mil fleece-backed thermoplastic single-ply membrane (quantity as required for two buildings)
  - Tapered isocyanurate insulation and coverboard
  - New louvers and vents
  - Perimeter and projection flashings
- Unique Requirements:
  - Contractor must provide a five-year guarantee
  - Manufacturer must provide a thirty-year no-dollar-limit warranty covering labor, materials, and metal flashings
  - All materials must meet specified performance and warranty standards
  - City/county permits required
- OEMs & Vendors:
  - No specific OEMs or vendors are mandated; all materials must meet performance and warranty criteria
- Estimated Contract Value:
  - $915,000 (including $140,000 in allowances)
- Potential Competitors:
  - Roofing and construction firms specializing in commercial and institutional roofing projects

### Description

This solicitation is for the removal of existing roofing systems down to the deck and installation of a new high-performance 80 mil fleece-backed thermoplastic single-ply membrane on Student Housing Buildings 5 and 7. The project includes remediation of lead-containing materials on specific building components, such as silver foil on exhaust flues in Building 5 and lead-painted parapet caps on Building 7. The estimated contract value is $915,000, which includes $140,000 in allowances. The bidding stage is open with electronic bid responses accepted, and a pre-bid meeting is scheduled for October 1, 2026. The bid response deadline is October 20, 2026, at 2:00 PM.

[View original listing](https://vendors.planetbids.com/portal/24809/bo/bo-detail/146474)
