# SAM #140L3926Q0049

Bassie Spring Improvement Project – Site Development and Spring Enclosure for BLM Nevada

**Buyer:** BLM Nevada State Office
**Posted:** September 25, 2026
**Respond By:** October 26, 2026
**Identifier:** 140L3926Q0049
**NAICS:** 237310, 238990, 237990

The Bureau of Land Management, Nevada State Office (Carson City District), is seeking contractor services for the Bassie Spring Improvement Project in Churchill County, Nevada.
- Government Buyer:
  - Bureau of Land Management, Nevada State Office, Carson City District
  - Contact: Carey Grund
- Project Scope:
  - Removal of defunct spring diversion structure
  - Installation of a new spring diversion box (part number: 7540-01-152-8067)
  - Installation of 650 ft of steel pipe rail fence to protect the spring riparian area
  - Installation of 175 ft of 1-inch PVC pipe with couplers
  - Installation of float shut-off valve on stock trough inlet port
  - Installation of a round, poly, 8-foot diameter, 625-gallon stock trough
  - All materials and labor to be provided by contractor
- Products Requested:
  - Pipe Rail Fence (650 ft)
  - Spring Diversion Box (1, part number: 7540-01-152-8067)
  - PVC Pipe (175 ft)
  - Float Valve (1)
  - Stock Trough (1, 8-foot diameter, 625-gallon capacity)
- Services Requested:
  - Labor and equipment for removal/disposal of old structures, fence installation, spring development, and material transport
- Unique Requirements:
  - Compliance with Davis-Bacon Act wage determinations
  - Environmental and cultural resource protections
  - Fire prevention measures
  - Buy American construction material standards
  - Migratory bird clearance survey required if work starts before September 1, 2027
  - Small business set-aside; best-value award process
- No specific OEMs or branded vendors are mentioned; contractor must supply all materials.

### Description

BASSIE SPRING IMPROVEMENT PROJECT PER PERFORMANCE WORK STATEMENT

[View original listing](https://sam.gov/opp/0550ee6ca84d4b8e84486d2357d9b472/view)
