# SAM #FA852426R0025

Depot-level repair of Aircraft Fuel Boost Pump (Eaton P/N 62218-1) for HC-130J and MC-130J aircraft

**Buyer:** AFSC
**Posted:** September 24, 2026
**Respond By:** October 09, 2026
**Identifier:** FA852426R0025
**NAICS:** 336413, 336412

The U.S. Air Force Sustainment Center is seeking qualified sources for depot-level repair of Aircraft Fuel Boost Pumps used on HC-130J and MC-130J aircraft.
- Government Buyer:
  - U.S. Air Force Materiel Command, Air Force Sustainment Center, FA8524 AFSC PZAAA
  - Procuring Contracting Officer: Teresa Smith
- OEM Highlight:
  - Sole source OEM is Eaton Corporation
- Products/Services Requested:
  - Depot-level repair of Aircraft Fuel Boost Pump
    - Part Number: 62218-1
    - NSN: 1680-01-531-2588SO
    - Used on HC-130J and MC-130J aircraft
  - Repair scope includes:
    - Inspection, functional checkout, disassembly, assembly, testing, and restoration to serviceable condition
    - No changes to original design or functional capabilities unless authorized by the government
- Contract Details:
  - Firm Fixed Price Indefinite Delivery Contract (IDC)
  - Five-year duration: basic period plus four annual ordering periods
  - Delivery location to be determined
  - Assets due 60 days after receipt of order or repairable assets
- Unique Requirements:
  - Contractors must demonstrate expertise in repairing similar components and maintaining quality standards
  - Must be capable of restoring pumps to serviceable condition without unauthorized modifications

### Description

<p>The Government is conducting market research to identify potential sources that possess the expertise, capabilities, and experience to meet qualification requirements to repair the Aircraft Fuel Boost Pump listed below:<br />
NOUN: Aircraft Boost Pump 1680-01-531-2588SO</p>

<p>PART NUMBER: 62218-1<br />
This requirement is for the depot level repair of Aircraft Fuel Boost Pumps which is utilized on the HC-130J and the MC-130J aircrafts.<br />
The extent of repair work required shall be determined by the initial inspection/functional checkout and the disassembly/assembly required to return items to aserviceable condition that shall efficiently serve their intended purpose. Original design of the end item and parts thereof, or the design functional capabilities of the end item, shall not be changed, modified or altered unless such changes areauthorized in writing by the Procuring Contracting Officer (PCO).<br />
This effort will be executed as a Firm Fixed Price Indefinite Delivery Contract(IDC) Requirements contract, consisting of a Basic and 4 annual ordering periods for a total of 5 years. The place of delivery is To Be Determined (TBD) and assets are due 60 days After Receipt of Order (ARO) or Repairable Assets, whichever is Later.</p>

[View original listing](https://sam.gov/opp/86d4485c7a67490a91e71198fef11185/view)
