# City of Arlington Ionwave #PWSM27001 Addendum 1

Arlington Concrete Panel & Sidewalk Replacement Program – Citywide Construction Bid

**Posted:** September 14, 2026
**Respond By:** October 07, 2026
**Identifier:** PWSM27001 Addendum 1
**NAICS:** 237310, 238110, 237990

The City of Arlington Department of Public Works is seeking bids for the 2027 Concrete Panel & Sidewalk Replacement Program, a large-scale infrastructure project across Arlington, Texas.
- Government Buyer:
  - City of Arlington Department of Public Works
- Scope of Work:
  - Removal and replacement of miscellaneous concrete panels, sidewalks, ramps, curbs, gutters, valley gutters, driveways, retaining walls, and pavement markings
  - Includes ADA-compliant barrier-free ramps (TxDOT PED-18) and curb drains (R3262 Neenah Foundry or equivalent)
  - Mobilization, bonds, and grass sodding also required
- Products & Quantities:
  - Reinforced concrete paving (8-inch high early strength): 750 units
  - Reinforced concrete pavement (hand finished): 30 units
  - Asphalt street transitions: 500 units
  - Exposed aggregate concrete: 200 units
  - Retaining walls: 15 units
  - Curb drains: 60 units (R3262 Neenah Foundry or equivalent)
  - Grass sodding: 2,000 units
  - Sidewalks (4-inch reinforced): 1,000 units
  - ADA-compliant ramps: 20 units (TxDOT PED-18)
  - Footer for back of curb sidewalk: 500 units
  - Concrete curb & gutter: 750 units
  - Valley gutter: 2,000 units
  - Commercial drive approaches: 30 units
  - Residential drive approaches: 250 units
  - Permanent pavement markings (various types): 5,000+ units
  - Raised pavement markers (various types): 3,000 units
- Notable Requirements:
  - All contractors and subcontractors must be pre-qualified
  - Compliance with prevailing wage rates and ADA standards is mandatory
  - Performance, payment, and maintenance bonds required
  - Maintenance bond coverage for two years post-acceptance
  - Project duration is 270 calendar days from Notice to Proceed
- OEMs Mentioned:
  - Neenah Foundry (curb drains, part number R3262)
  - Texas Department of Transportation (TxDOT) standard for ADA ramps (PED-18)
- Estimated Contract Value:
  - $4,682,950

### Description

The City of Arlington's Department of Public Works has issued a bid opportunity for the 2027 Concrete Panel & Sidewalk Replacement Program. The project primarily consists of removal and replacement of miscellaneous concrete panels, miscellaneous concrete, ramps, and sidewalks. A pre-bid meeting/teleconference is scheduled to discuss the scope of work, and prospective bidders are encouraged to participate. Bids must be submitted by October 7, 2026, at 10:00 AM Central Time.

[View original listing](https://arlington-tx.ionwave.net/PublicDetail.aspx?bidID=2354&SourceType=1)
