# El Paso Water Ionwave #CSP46-26 Addendum 1

El Paso Water Utilities seeks proposals for furnishing, installation, and maintenance of pumping systems for 12 wells (Phase 5 Re-bid)

**Posted:** September 04, 2026
**Respond By:** October 07, 2026
**Identifier:** CSP46-26 Addendum 1
**NAICS:** 238290, 221310

El Paso Water Utilities Public Service Board is seeking proposals for the furnishing, installation, and maintenance of pumping systems as part of Phase 5 (Re-bid) of its well rehabilitation program.
- Scope includes rehabilitation of twelve existing water wells
  - Furnishing and installation of 12 well pumps, motors, soft starter/VFD motor controllers, and associated equipment
  - Associated equipment installation for each well
- Services required:
  - Well rehabilitation activities (pre- and post-video survey, pumping tests, casing liner installation, chemical treatments, bailing and brushing to depths of ~1,200 feet)
  - Allowance for urgent well repairs and installation at booster stations
- Notable requirements:
  - Offerors must have at least four successful projects involving vertical turbine line shaft well pumps to 600 feet depth
  - Must hold a current State of Texas Well Pump Installers license
  - Demonstrated experience with 480V, 3-phase electrical work, including switchgear and controls
  - At least 10 years of well rehabilitation and specific capacity testing experience
  - Key personnel must meet experience thresholds and be assigned full-time
- Estimated contract value: $7,948,800 to $9,052,800
- Project duration: approximately 18 months with milestone deadlines for mechanical and substantial completion
- No specific OEMs or product part numbers are mentioned in the solicitation

### Description

This solicitation is for the furnishing, installation, and maintenance of pumping systems as part of Phase 5 (Re-bid) for El Paso Water Utilities. The project includes rehabilitation activities for twelve existing wells, installation of well pumps, motors, soft starter/VFD motor controllers, and associated equipment. The contract also includes an allowance for expedited urgent well repairs and may involve furnishing and installation of pumps and motors for existing booster stations. The project duration is estimated at 18 months with specific milestones for mechanical and substantial completion of wells.

[View original listing](https://epwater.ionwave.net/PublicDetail.aspx?bidID=403&SourceType=1)