# City of Long Beach Buyspeed #UD-26-361

Cherry Avenue Sewer Improvement Project Bid Request

**Posted:** September 18, 2026
**Respond By:** October 14, 2026
**Identifier:** UD-26-361
**NAICS:** 237110, 237990, 237310

The Long Beach Utilities Department, Engineering Bureau, is seeking bids for the Cherry Avenue Sewer Improvement Project (SC-0512).
- Government Buyer:
  - Long Beach Utilities Department, Engineering Bureau
- Products/Services Requested:
  - Installation of approximately 3,100 linear feet of vitrified clay pipe (VCP) or high-density polyethylene (HDPE) sewer line
  - Construction of 12 new 48-inch sewer maintenance holes and 1 new 60-inch drop sewer maintenance hole
  - Removal, replacement, or abandonment of existing sewer lines and manholes
  - Dewatering, sewer flow bypassing, post-construction video inspection
  - Pavement removal and replacement, trenching, backfilling, and compacting
  - Traffic control, survey staking, and compliance with CA MUTCD and City of Long Beach standards
- Unique/Notable Requirements:
  - Maintain pedestrian and bicycle access throughout construction
  - Ensure ADA compliance
  - Notify local agencies and schools prior to work
  - Adhere to specified work hours (8:30 AM to 3:30 PM, Monday-Friday)
- OEMs and Vendors:
  - No specific OEMs are named; bidders must comply with referenced standards and specifications
- Attachments:
  - Project Specifications, Project Plans, Traffic Control Plan

### Description

This solicitation is for the Cherry Avenue Sewer Improvement Project involving the installation of approximately 3,100 linear feet of vitrified clay pipe (VCP) or high-density polyethylene (HDPE) sewer line, 12 new 48-inch sewer maintenance holes, and 1 new 60-inch drop sewer maintenance hole. The work includes removal and replacement or abandonment of existing sewer lines and manholes, dewatering, sewer flow bypassing, post-construction video inspection, pavement removal and replacement, trenching, backfilling, and compacting. Bidders are encouraged to attend an optional virtual pre-bid meeting. The project requires traffic control and survey staking as part of the construction activities.

[View original listing](https://longbeachbuys.buyspeed.com/bso/external/bidDetail.sda?docId=UD-26-361&external=true&parentUrl=close)
