# Connecticut Portal #BID 2027-08

Stormwater Pipe Modifications and CIPP Lining at Hartford WPCF

**Posted:** September 17, 2026
**Respond By:** October 16, 2026
**Identifier:** BID 2027-08
**NAICS:** 237110, 237990

This opportunity from the State of Connecticut Department of Administrative Services (DAS) Procurement focuses on stormwater infrastructure upgrades at the Water Pollution Control Facility (WPCF) in Hartford.
- Government Buyer:
  - State of Connecticut Department of Administrative Services (DAS) Procurement
  - Project location: Water Pollution Control Facility, Hartford, CT
- Products/Services Requested:
  - Modifications to Diversion Chamber C inlet pipe
  - Cured-in-Place Pipe (CIPP) lining for:
    - 225 linear feet of 54-inch corrugated metal pipe (CMP)
    - 105 linear feet of 12-inch reinforced concrete pipe (RCP)
  - Dewatering, cleaning, ground water control, and CCTV inspection services
- OEMs and Vendors:
  - No specific OEMs or vendors are named in the solicitation
- Unique/Notable Requirements:
  - Mandatory pre-bid meeting for all interested bidders
  - Bids must be submitted in hard copy (not electronically)
  - Drawings and specifications provided as attachments
  - Project involves specialized CIPP lining technology for large-diameter stormwater pipes

### Description

This solicitation is for modifications to the Diversion Chamber C inlet pipe at the Water Pollution Control Facility (WPCF). The work includes dewatering, cleaning, ground water control, CCTV inspection, and Cured-in-Place (CIPP) lining. The project involves approximately 225 linear feet of 54-inch corrugated metal pipe stormwater pipe and approximately 105 linear feet of 12-inch reinforced concrete pipe stormwater pipe. A pre-bid meeting is scheduled for 09/29/2026 at 10:00 AM. Bids are not to be submitted electronically.

[View original listing](https://webprocure.proactiscloud.com/wp-web-public/en/#/bidboard/bid/145800?pagenumber=1&customerid=51)