# La Habra Planet bids #4-B-26

Design and Construction of EV Charging Station at La Habra Community Center

**Posted:** September 16, 2026
**Respond By:** October 12, 2026
**Identifier:** 4-B-26
**NAICS:** 238210, 237130

The City of La Habra is seeking proposals for the design and construction of an EV charging station at the La Habra Community Center.
- Government Buyer:
  - City of La Habra, Community Development, Engineering Division
  - Contact: Andrew Luna, PE, Acting City Engineer / Senior Civil Engineer
- OEMs and Vendors:
  - ChargePoint (OEM for EV charging station)
  - Equivalent products from other manufacturers are allowed
- Products Requested:
  - ChargePoint CPE250 DC fast charging station (Level 3, 62.5kW output), quantity: 1
  - 75KVA transformer, quantity: 1
  - 200A main breaker/disconnect, quantity: 1
  - Electrical conductors and conduit (quantity not specified)
  - Concrete pads for transformer and charging station, quantity: 1 each
  - Local disconnect for charging station, quantity: 1
  - Safety/crash protection bollards, quantity: 2
  - EV parking sign, quantity: 1
  - EV parking space stenciling/marking, quantity: 1
  - NO PARKING access aisle striping/restriping, quantity: 1
- Services Requested:
  - Electrical design and construction services (including permitting, installation, and coordination)
  - Permitting services (compliance with California Green Building Code and local codes)
  - Project management and coordination
- Unique/Notable Requirements:
  - C-10 Electrical Contractor License required
  - Compliance with California labor laws and prevailing wages
  - ADA-compliant parking modifications
  - Mandatory job walk for proposal submission
  - Project completion required within 70 working days from Notice to Proceed
  - Liquidated damages of $500 per day for delays
  - One-year warranty on work performed; maintenance bond may be required if EV charger warranty exceeds one year

### Description

This solicitation is for the design and construction of electrical services for an EV Charging Station at the La Habra Community Center. The work includes obtaining necessary permits, providing materials, labor, and equipment, electrical service installation from the electrical service room, EV parking space striping and signing, and installation of one Level 3 ChargePoint CPE250 DC fast charging station or equivalent with 62.5kW output. A mandatory job walk is scheduled for September 28, 2026, and proposals are due by October 12, 2026. The project duration is seventy working days with liquidated damages of $500 per day for delays.

[View original listing](https://vendors.planetbids.com/portal/56603/bo/bo-detail/146292)