# C.E. Gleeson Constructors Inc. Procureware #E26-206

Conversion of LA Fitness Facility to Club Studio in Alexandria, VA

**Posted:** September 15, 2026
**Respond By:** October 01, 2026
**Identifier:** E26-206
**NAICS:** 236220, 238350, 238210, 238220, 238990

This opportunity involves the conversion of a multi-level LA Fitness facility into a Club Studio in Alexandria, VA, managed by Gleeson Constructors.
- Scope includes:
  - Selective demolition, cast-in-place concrete, structural steel, metal framing, architectural woodwork, and interior finishes
  - Installation of doors, windows, glass entrances, and door hardware
  - Specialty construction such as saunas, laundry room equipment, cryotherapy rooms, fire alarm system, and hydraulic passenger elevators
  - Mechanical and electrical work, including HVAC, plumbing, fire protection, and electrical utility services
  - Furnishing and installing architectural millwork
  - Installation of owner-furnished audio, camera, and microphone equipment
- Notable requirements:
  - Bid alternates for millwork and equipment installation
  - Wide range of specialty items (lockers, signage, fire protection, testing and balancing)
- OEMs and vendors mentioned:
  - No specific OEMs named in the solicitation
  - Potential vendors include CALIBER FIRE CONTROL, Grid Flooring and Locker, KAISER ELEVATOR CORPORATION, masonryfoamsandcoatings, Nature In Form LLC
- Products/services requested:
  - Architectural millwork (furnish and install)
  - Installation of owner-furnished audio, camera, and microphone equipment
  - Construction and specialty items (see detailed line items)
- Construction duration is seven months, with no option years or annual subscription.

### Description

This solicitation is for the conversion of an existing multi-level 44,139 SF LA Fitness facility into a Club Studio. The project includes selective demolition, cast-in-place concrete, structural steel, metal framing, woodwork, thermal and moisture protection, doors and windows, finishes, specialties, special construction, conveying systems, mechanical, and electrical work. Bidders are required to submit bids for furnishing and installing architectural millwork, as well as installing audio, camera, and microphone equipment furnished by the owner. The construction duration is anticipated to be 7 months starting December 1st, 2026.

[View original listing](https://gleesonconstructors.procureware.com/Bids/c4d7c46e-e67e-474f-bef6-d7e0c114b16e)
