# Nevada ePro #43ADG-S4017

Nevada National Guard Camp Washoe Gas Supply Line Upgrade (Trenching and Restoration)

**Posted:** September 15, 2026
**Respond By:** October 23, 2026
**Identifier:** 43ADG-S4017
**NAICS:** 237120, 237110, 237990

The Nevada National Guard is seeking contractors for the Camp Washoe Gas Upgrade project in Reno, Nevada.
- Government Buyer:
  - Nevada National Guard, Office of the Military
  - Nevada Army National Guard, Office of Installations and Environment
- Project Scope:
  - Trenching and restoration of approximately 170 linear feet of 2-inch polyethylene gas supply lines
  - Includes all labor, supervision, materials, equipment, tools, permits, testing, inspections, and coordination
  - Restoration of pavement, landscaping, and other disturbed surfaces
  - Traffic control, utility locating, potholing, and mobilization/demobilization
  - Coordination with NV Energy (utility provider) and City of Reno for permits and inspections
- Products/Materials:
  - 2-inch polyethylene gas supply pipe (approx. 170 linear feet)
  - Sand bedding, select material, native backfill, aggregate base, warning tape
- Services:
  - Trenching, excavation, backfill, compaction, surface restoration, permitting, inspection, and gas supply line restoration
- Unique Requirements:
  - Compliance with NV Energy gas-service construction standards and City of Reno requirements
  - Mandatory site visit for vendors
  - Proof of liability and workers compensation insurance required
  - Vendors must be registered with the State of Nevada Controllers Office
  - Electronic payment transfer required
  - Access to National Guard property requires background checks and security compliance
  - Minimum one-year warranty for labor and materials
- No specific OEMs or named vendors; NV Energy is referenced as the utility provider whose standards must be followed.

### Description

This project involves trenching and restoration of polyethylene gas supply lines at the Nevada Army National Guard's Camp Washoe facility. The scope includes all labor, supervision, materials, equipment, permits, testing, inspections, and coordination necessary for a complete, code-compliant installation and final surface restoration. The contract term is expected to be two years, starting approximately December 1, 2026, and ending December 1, 2028. The procurement is conducted by the Nevada National Guard - Office of the Military and includes compliance with applicable NV Energy standards and City of Reno requirements.

[View original listing](https://nevadaepro.com/bso/external/bidDetail.sda?docId=43ADG-S4017&external=true&parentUrl=close)
