# SAM #W912HQ26S0077

Commissioning of Data Center Cooling Systems and UPS Battery Replacement for USACE Headquarters

**Buyer:** Humphreys Engineer Center Support Activity
**Posted:** September 15, 2026
**Respond By:** September 25, 2026
**Identifier:** W912HQ26S0077
**NAICS:** 238210, 238290

The U.S. Army Corps of Engineers Headquarters is seeking a small business contractor for the full start-up commissioning of data center cooling infrastructure and replacement/disposal of UPS batteries at its Alexandria, VA facility.
- Government Buyer:
  - U.S. Army Corps of Engineers Headquarters (Mission Support Battalion)
- OEMs and Vendors:
  - Eaton (UPS system)
  - C&D Technologies (UPS batteries)
  - Liebert (CRV units and IRC controllers)
  - Multistack (Roof Top Chiller)
- Products/Services Requested:
  - Commissioning of 12 Liebert CRV units (environmental control systems)
  - Configuration of 2 Liebert IRC controllers
  - Start-up of 1 Multistack Roof Top Chiller (glycol system)
  - Replacement of 80 batteries for Eaton PW9390-160 UPS with C&D Technologies UPS12-400MR batteries
  - Removal and EPA-compliant disposal of old batteries (including Certificate of Recycling/Disposal)
  - Installation, cleaning, and torque labor for new batteries (including IEEE 1188 compliant testing and discharge testing)
  - Calibration and testing of Eaton PW9390-160 UPS system after battery installation
  - Top fan motor replacement (part number CR032RC132J781)
- Unique/Notable Requirements:
  - Mandatory site visit at the Cude Building, Alexandria, VA
  - US citizenship or national status, valid government ID, and driver license required for facility access
  - EPA and hazardous waste regulations must be followed for battery disposal
  - All work must be completed within 60-90 days of contract award
  - Technical proposal, past performance references, and pricing required for evaluation
  - Firm-fixed price contract under NAICS 238210


### Description

<p><strong>Offers</strong> are due <strong>25 SEPT</strong>. The U.S. Army Corps of Engineers Headquarters has a requirement to execute the full start-up and commissioning of existing data center environmental control systems based on original design specifications, as well as the replacement and EPA-compliant disposal of batteries for an Eaton Uninterruptible Power Supply (UPS) system.This procurement will be awarded under Simplified Acquisition Procedures. There will be one <strong>site visit a</strong>t the Cude Building 2592 on <strong>Friday, 18 September. </strong>The site visit is&nbsp;<strong>required.</strong>&nbsp; All contractors will need to meet at the CUDE Building 2592, 7701 Telegraph Road, Alexandria, Virginia 22315 for check-in beginning at 9am EST. All contractors who wish to be at the site visit must send their <strong>names, phone numbers, and company names </strong>to the Contract Specialist, Rick Klein, via email. All contractors must be US Citizen or US National and possess a valid Government ID. Must have driver license to enter Facilities. It is the Offeror&rsquo;s responsibility to ensure the quote has been received by the contracting office via email. Fax quotes will not be accepted. Late quotes will be processed in accordance with RFO 52.212-1(c) &ldquo;Late submission, modifications, revisions, and withdrawals of offers.&rdquo; Upon receipt of the electronic offer, the Government will acknowledge receipt of that offer via email to the Offeror.</p>

[View original listing](https://sam.gov/opp/e82f4955536e4882af76433d7a604f09/view)