# Massachusetts COMMBUYS #DFW-2027-007

ADA Compliant Ramp and Incidentals Construction at MassWildlife Western District Office

**Posted:** August 05, 2026
**Respond By:** September 30, 2026
**Identifier:** DFW-2027-007
**NAICS:** 238990

MassWildlife is seeking bids for the construction of an ADA compliant ramp and related improvements at its Western District Office in Dalton, MA.
- Government Buyer:
  - Department of Fish and Game, Division of Fisheries and Wildlife, Western District Office
- Scope of Work:
  - Demolition and removal of existing ramp and pavement
  - Grading and leveling of site
  - Construction of a disability-accessible ramp with landings, compliant with 521 CMR and ADA standards
  - Installation of compliant handrails on entrance steps (approx. 14.5 feet wide, pressure treated lumber)
  - Replacement of three outdoor motion sensor light fixtures (2 LED floodlight heads each, 180-degree sensing angle, minimum 3,000 lumens)
  - Installation of aluminum gutters and downspouts (approx. 15 feet over steps, 7 feet over ramp) to prevent ice buildup
- Products/Services Requested:
  - ADA compliant ramp and associated railing work (1 lump sum)
  - Handrails on front steps (1 lump sum)
  - Aluminum gutters with downspouts (1 lump sum)
  - Motion sensor light fixtures (3 units)
  - Construction services (all labor, materials, equipment, and incidentals)
- Unique Requirements:
  - Strict adherence to Massachusetts prevailing wage laws
  - Mandatory attendance at a bidders conference prior to bid submission
  - Completion of workforce participation reporting forms
  - Bid deposit of 5% required
- No specific OEMs or vendors are named; solicitation is open to qualified construction contractors.
- Estimated contract value: $50,000.

### Description

This solicitation is for the construction of an ADA compliant ramp and other incidentals at the Western District Office, located at 88 Old Windsor Road, Dalton, MA. The work includes demolition of the existing ramp, grading, ramp construction with handrails and landings, installation of handrails at entrance steps, replacement of motion sensor lights, and installation of gutters and downspouts. The project must be completed between October 19, 2026, and June 18, 2027. A mandatory pre-bid conference is scheduled for September 15, 2026, onsite at the Western District Office.

[View original listing](https://www.commbuys.com/bso/external/bidDetail.sda?docId=BD-27-1046-DFW-FW58-131887&external=true&parentUrl=close)
