Opportunity
City of Cottage Grove CivicPlus #24-001D
Cottage Grove Lincoln Middle School Path Phase I Construction Project
Posted
May 22, 2026
Respond By
June 11, 2026
Identifier
24-001D
NAICS
237310, 237990, 238910
This opportunity involves the construction of a shared use path and fire apparatus access road turnaround for the City of Cottage Grove, Oregon, connecting Lincoln Middle School to East Hayes Avenue along the Coast Fork River. - Government Buyer: - City of Cottage Grove, managed by the City Engineer's office - Scope of Work: - Construction of fire apparatus access road turnaround - Shared use path construction - Excavation, trenching, compaction, paving - Extension of storm drain pipes (HDPE and other types) - Removal of trees and root balls - Site restoration including permanent seeding and topsoil - Installation of removable bollards, sign support footings, and chain link fence work - Products/Services Requested: - Mobilization, bonds, and insurance (lump sum) - Temporary work zone traffic control (lump sum) - Erosion control (lump sum) - Construction survey (lump sum) - Saw cutting (30 LF) - General excavation (1073 Cu Yd) - Subgrade stabilization (100 Cu Yd) - Subgrade geotextile (1284 Sq Yd) - Loose riprap, Class 200 (2 Cu Yd) - 18-Inch storm sewer pipe, HDPE corrugated (40 LF) - 40-Inch storm sewer pipe (6 LF) - Minor adjustment of manhole (1 Each) - Connect to existing culvert (2 Each) - Gravel shoulder and access (aggregate base, crushed rock) - Level 2, 1/2" Dense HMAC, 4-Inches Thick (379 Sq Yd) - Extra for asphalt approaches (1 Each) - Removable bollards (1 Each) - Sign support footings (lump sum) - Shared-use path, concrete walks, 6-Inch thick (128 LF) - Concrete curb, straight/standard, 16" high (8 LF) - Site restoration, permanent seeding, and topsoil (lump sum) - Removing and rebuilding 6'-high chain link fence - Unique/Notable Requirements: - Bidders must be pre-qualified in street repair and underground utility construction - Compliance with Oregon prevailing wage laws - Funding provided by ODOT and city funds - All bid documents and addenda available on the City of Cottage Grove's website - OEMs and Vendors: - No specific OEMs or vendors are named in the solicitation - Place of Performance: - 1565 S. 4th St. and along the Coast Fork River, Cottage Grove, Lane County, Oregon - City of Cottage Grove offices - Contracting office in Springfield, Oregon
Description
The City of Cottage Grove, Oregon, is soliciting sealed bids for the Lincoln Middle School Path Phase I Project. The project includes construction of a fire apparatus access road turnaround and a new shared use path along the Coast Fork River, connecting Lincoln Middle School to East Hayes Avenue. Work involves excavation, trenching, compaction, paving, extension of storm drain pipes, removal of trees, and site restoration. Bidders must be pre-qualified in street repair construction and submit sealed bids by 2:00 pm Pacific Time on June 11th, 2026. All bid documents and addenda are available on the City of Cottage Grove's website.