# Union County Board of Education Facilities Committee Meeting (Nov. 18, 2026)


**Body:** Union County Board of Education 
**Date:** November 18, 2026
**Jurisdiction:** SLED

**Tags:** Construction & Infrastructure, Physical Infrastructure


The Union County Board of Education Facilities Committee met on November 18, 2026. Members approved the open-session minutes and voted to send Optima Engineering’s Phase 3 design proposal for the Benton Heights Elementary School of the Arts HVAC renovation to the full board for approval. The proposal was reported at approximately $286,650, funded through FY27 building systems funds. The committee also discussed replacing flooring in common areas after the removal of existing tile left visible adhesive marks. Staff recommended obtaining firm pricing and bidding both polyaspartic and epoxy options, with funding expected from savings on capital improvement projects. No vote on the flooring work was recorded; projects exceeding $100,000 would require board approval.

The committee received updates on bond-funded construction. At Forest Hills, barn site preparation is proceeding, with the metal building expected around mid-January. Stadium ramp work was separated because of lead times, and bids for the remaining work—including renovation of the concession stand, restrooms, and related areas—were expected December 8. The concession stand scope includes a roof, lighting and electrical upgrades, stainless-steel cabinetry, storage, and a grease interceptor; members also raised questions about temporary concessions and site lighting. School construction updates covered HVAC, flooring, tile, ceilings, lighting, and mechanical and plumbing work. A construction-manager pre-construction contract had gone to the board earlier in the month and was being finalized. No new contract award was reported.

**Source:** Union County Board of Education
