Award
Clearfield 2019B-17
2019B-17 Clearfield City Freeport South Well Building Improvement Project
Recipient
JR Burton Contractors
Award Amount
$287,513.00
Ceiling
$287,513.00
Awarded
January 22, 2020
Identifier
2019B-17
The award was made by Clearfield City for the project titled '2019B-17 Clearfield City Freeport South Well Building Improvement Project.' The contract was awarded to JR Burton Contractors, which was the lowest responsible bidder among several companies. The scope of work includes demolition of the existing well house, rehabilitation of an 875-foot deep well, construction of a new brick well house with a wood truss system and standing seam metal roof, installation of storm drain pipes and boxes, plumbing fittings and electrical control equipment, chain-link perimeter fencing, gravel bedding and backfill, asphalt pavement drive access, and related infrastructure. The project involves construction services, site work, and equipment installation, with detailed line items and quantities provided. The contract also specifies bid security requirements and contractor licensing. The project location is in Clearfield, Utah, and the award was part of a public works municipal infrastructure improvement. The procurement process included multiple bids, with JR Burton Contractors submitting the lowest bid, and the award was finalized after bid evaluation and bonding.
Description
The project includes furnishing all labor, tools, materials, equipment, transportation, and services required for construction including demolition of the existing well house structure; rehabilitation of existing 14-inch diameter 875 foot deep well; construction of new brick well house building; wood truss system, standing seam metal roof system; installation of storm drain pipe and boxes; installation of plumbing fittings and equipment; installation of electrical control equipment; installation of the chain-link perimeter fence materials; gravel bedding and backfill; construction of asphalt pavement drive access; and all appurtenant work in accordance with the Drawings and Specifications prepared by the Engineer, CEC, Civil Engineering Consultants, PLLC.