Award

Orange County M00000120323

Fire Headquarters York Chiller Install Quote dated: 10/13/2025 ITEM: Quantity one (1) TAG: YLAA01 00SJ46PC EQUIPMENT ...

Recipient

JOHNSON CONTROLS US HOLDINGS INC DBA

Award Amount

$143,833.00

Ceiling

$143,833.00

Awarded

January 22, 2026

Identifier

M00000120323

The Orange County county government in Florida awarded a contract to Johnson Controls US Holdings Inc. for the installation of a York Chiller at Fire Headquarters, with an obligated and award amount of $143,833. The purchase includes a single York Chiller with specific features such as hermetic scroll compressor, stainless steel brazed plate evaporator, microchannel condenser, and associated fans and control cabinets. The scope involves using an existing concrete pad, post-install controls mapping, permitting, crane and rigging, and piping work. The award was made on January 22, 2026, and is a single-transaction contract.

Description

Fire Headquarters York Chiller Install Quote dated: 10/13/2025 ITEM: Quantity one (1) TAG: YLAA01 00SJ46PC EQUIPMENT DESCRIPTIONS: YLAA01 00SJ46PC ITEM I: York Chiller YLAA STANDARD FEATURES: COMPRESSOR --- Hermetic scroll COMPRESSOR MOTOR --- Capable of monitoring compressor motor current which provides protection against reverse rotation, phase-loss and phase-imbalance BRAZED PLATE EVAPORATOR --- 316L stainless steel corrugated channel plates --- Water inlet and outlet connections are grooved for compatibility with field supplied couplings MICROCHANNEL CONDENSER --- Integral subcooling --- Rated for 650 psig CONDENSER FANS --- Direct driven independent motors --- Fan guards constructed of heavy gauge rust resistant coated steel --- All blades statically and dynamically balanced CONDENSER FAN MOTORS --- TEAO type motors --- Permanently lubricated bearings CONTROL/ELECTRICAL CABINETS --- NEMA 3R/12 cabinet --- Liquid tight conduit to compressor and fans SCOPE Summary: - JCI will use existing concrete pad for new chiller - JCI will have a controls tech come in after install to map all new points in on Metasys and verify graphics are working - Check in/ schedule with Director of Facilities - JCI can provide mechanical permitting all GC permitting/ trade permitting to be provided by others (JCI excludes) - Supply crane and rigging to place new chiller on customer supplied concrete pad. - Supply and make necessary piping and the new unit tying into existing piping. - Factory st