Award

Los Angeles County Department of Beaches and Harbors PO-BH-26006952

Electrical Switchgear Replacement Installation Services Procurement by Los Angeles County Department of Beaches and Harbors

Recipient

HAMI CONSTRUCTION INC

Award Amount

$44,796.00

Ceiling

$44,796.00

Awarded

February 17, 2026

Identifier

PO-BH-26006952

The Los Angeles County Department of Beaches and Harbors procured electrical switchgear replacement installation services through purchase order PO-BH-26006952. The awarded vendor is HAMI CONSTRUCTION INC, responsible for the supply and installation of materials and equipment, labor installation, permits and city fees, freight, and insurance fees related to the project. The scope of work, as detailed in the statement of work Exhibit A, includes coordination with Edison and Malibu Building and Safety/Public Works to obtain permits and city fees, shutdown and replacement of a 400-AMP electric switchgear (provided by the owner), removal and replacement of corroded conduits, installation of new wiring from the 400-AMP gear to a new 200-AMP panel, and provision/installation of a new 100-AMP subpanel next to the 200-AMP panel for future use. The contractor shall coordinate power shutdown with Southern California Edison (SCE), schedule and obtain rough and final inspections, and ensure proper testing of the power distribution panel after reconnection. The worksite is to be barricaded and protected, with cleanup and debris removal after completion. Additional professional electrical engineering/planning permits were provided by Abrari & Associates Inc. The total award amount was $44,796.00. The department contact is Mark Spiro (MSpiro@bh.lacounty.gov, 310-350-2234), and the vendor contact is Armando Medrano (phone 626-575-8885). Invoices should be submitted to Fiscal_Procurement@bh.lacounty.gov.

Description

MATERIALS & EQUIPMENT CHARGE FOR THE INSTALLATION SERVICES OF THE ELECTRICAL SWITCHGEAR REPLACEMENT. PERFORM WORK PER STATEMENT OF WORK PROVIDED ON EXHIBIT A. (TAXABLE) PQ 26-00317 COORDINATE WITH EDISON AND MALIBU BUILDING AND SAFETY / PUBLIC WORKS TO OBTAIN PERMITS AND CITY FEES, SHUT DOWN POWER AND REPLACE THE SWITCHGEAR BOX. DISCONNECT/RECONNECT REMOVE AND REPLACE THE 400-AMP ELECTRIC SWITCHGEAR (PROVIDED BY OWNER). REMOVE AND REPLACE THE CORRODED CONDUITS AND PULL NEW 2/0 WIRES FOR ONE UNINTERRUPTED LINE FROM THE 400-AMP GEAR TO THE NEW 200AMP PANEL. PROVIDE AND INSTALL A NEW 100AMP SUBPANEL BESIDES THE 200-AMP PANEL FOR FUTURE USE. COORDINATE THE POWER SHUTDOWN WITH SCE TO REPLACE ELECTRIC SWITCHGEAR. SCHEDULE AND OBTAIN PERTINENT ROUGH /FINAL INSPECTIONS FOR THE REPLACEMENT OF SWITCHGEAR INSTALLATION. RECONNECT THE POWER DISTRIBUTION PANEL AND TEST FOR PROPER OPERATION. BARRICADE, COVER AND PROTECT WORK AREA AT ALL TIMES DURING CONSTRUCTION CLEAN AND HAUL AWAY ALL WORK-RELATED DEBRIS UPON COMPLETION. ALL WORK WILL BE SCHEDULED DURING BUSINESS HOURS OR WEEKENDS. DEPT CONTACT: MARK SPIRO 310-350-2234 MSpiro@bh.lacounty.gov VENDOR CONTACT: ARMANDO MEDRANO 626-575-8885 PLEASE SUBMIT INVOICES TO: Fiscal_Procurement@bh.lacounty.gov; LABOR/INSTALLATION CHARGE FOR THE INSTALLATION SERVICES OF THE ELECTRICAL SWITCHGEAR REPLACEMENT. PERFORM WORK PER STATEMENT OF WORK PROVIDED ON EXHIBIT A. (NON-TAXABLE); PERMITS/CITY FEES PERFORM WORK PER STATEMENT OF WORK PROVIDED ON EXHIBIT A. (NON-TAXABLE); FREIGHT (TRANSPORTATION OF GOODS) PERFORM WORK PER STATEMENT OF WORK PROVIDED ON EXHIBIT A. (NON-TAXABLE); INSURANCE FEES PERFORM WORK PER STATEMENT OF WORK PROVIDED ON EXHIBIT A. (NON-TAXABLE); CHANGE ORDER: ELECTRICAL ENGINEERING / PLANS PERMITS ABRARI & ASSOCIATES INC.