Award

Seattle PW# 2016-056

Highland Park Playground Park Renovation

Recipient

L.W. Sundstrom, Inc.

Award Amount

$379,161.20

Ceiling

$379,161.20

Awarded

January 04, 2017

Identifier

PW# 2016-056

The City of Seattle issued a construction bid for the Highland Park Playground Park Renovation project involving extensive site work, installation of play equipment, and landscaping. The project includes base work and two additive options for additional amenities and plantings. The estimated base cost is approximately $349,731 with additives totaling about $36,267.

Description

Elements of the work shall include, but is not limited to: Temporary construction stormwater control; removal of existing ballfield fencing and associated items; removal of existing play equipment and associated elements; removal of asphalt and concrete paving; relocation of existing water and irrigation and other elements; installation of asphalt, concrete, and crushed rock paving, concrete curbs, ramp, and stairs with walls and handrails; acceptance, storage, and installation of play equipment (provided by owner); installation of drainage and play area safety surfacing; installation of ballfield fencing, infield soil, and associated elements; installation of irrigation, subsurface drainage; earthwork, grading, hydroseeding, and restoration of disturbed site. Additive #1: Provide and install new drinking fountain and connection to existing water supply, 5 benches, three picnic tables, and 4 bleachers. Additive #2: Provide and install all plant material, including trees, shrubs, and associated soil preparation, and mulch.

View original record