Award

PUBLIC WORKS PDRQ-PW-26020401

Lead Stabilization Air Monitoring and Clearance Services at Morris Dam by Aurora Industrial Hygiene Inc.

Recipient

AURORA INDUSTRIAL HYGIENE INC

Award Amount

$34,175.00

Ceiling

$34,175.00

Awarded

March 14, 2026

Identifier

PDRQ-PW-26020401

This purchase order from the Public Works Department of Los Angeles, California, awarded to Aurora Industrial Hygiene Inc., covers lead stabilization air monitoring and clearance services at Morris Dam. The contract includes initial inspection, lead air sampling, clearance surface sampling, project management, and laboratory analysis, with a total obligated amount of $34,175. The services are to be performed at Morris Dam, Azusa, CA, and involve multiple line items such as field sampling, documentation, project management, surface sampling, shipping, and clerical work. The award is a single-transaction contract issued on March 14, 2026, with a detailed scope of work and specific laboratory and certification requirements.

Description

quote on 2/13/26 extended to 60 days (see attached e-mail) Lead Stabilization Air Monitoring and Clearance Morris Dam, 9500 N. San Gabriel Cyn. Road, Azusa, CA 91702 Abatement monitoring will include an initial inspection, a set of in progress lead air sampling and clearance surface sampling. Costs for 2 shifts of abatement monitoring and project management, are included in this proposal. 1. Monitoring will be conducted by a Lead Certified Sampling Technician. 2. Samples will be transferred to an AIHA, NVLAP certified laboratories for analysis. 24 hour turnaround time will be requested for results. Turnaround times start upon laboratory receipt. 3. Upon completion of the field work and receipt of laboratory results, a clearance notice will be provided (Notice to Contractor Form). A report will be provided approximately 3 weeks later. The report will be reviewed and signed by a Certified Industrial Hygienist who is also a CDPH Lead Certified Inspector/Risk Assessor. Field work LEAD SAMPLING TECH - FIELD; LEAD SAMPLING TECH - INITIAL DOCUMENTATION; CIH - PM/ FINAL DOC; CLERICAL; LEAD ICP-OEM - AIR; LEAD SURFACE (SOIL/WIPE); SHIPPING The shipping is costs to get the samples to the laboratory for analysis. (see attached e-mail)