Award
City of Los Banos #FIRE STATIONS 1 AND 2 ADA AND STATE STREETS SIDEWALK IMPROVEMENTS
Construction of FIRE STATIONS 1 AND 2 ADA AND STATE STREETS SIDEWALK IMPROVEMENTS
Recipient
Sinclair General Engineering Construction, Inc.
Award Amount
$881,799.00
Ceiling
$881,799.00
Awarded
August 01, 2019
Identifier
FIRE STATIONS 1 AND 2 ADA AND STATE STREETS SIDEWALK IMPROVEMENTS
The City of Los Banos, California, awarded a construction contract to Sinclair General Engineering Construction, Inc. for ADA improvements at Fire Stations 1 and 2, along with sidewalk and curb ramp enhancements at State Streets within the city. The project includes constructing concrete ADA curb ramps, sidewalks, curb and gutter, residential driveways, fire hydrant assemblies, storm drainage improvements, water meter boxes, sewer cleanout boxes, and applying thermoplastic markings. The contract specifies detailed construction tasks such as demolition, base preparation, concrete and asphalt paving, signage installation, utility adjustments, and tree removal, with quantities including 14 curb ramps, 85 water meter boxes, 8 sewer cleanout boxes, and 31 trees to be removed. The project is located in Los Banos, Merced County, California, and involves multiple vendors and exchange locations for bid documents. The contract requires completion within sixty (60) working days, with a bid opening date of August 1, 2019. The award was based on bids ranging from approximately $881,799 to over $2 million, with Sinclair General Engineering Construction, Inc. submitting the lowest bid. The project includes compliance with California prevailing wage laws, contractor registration, bonds, insurance, and environmental measures. The procurement process involved several companies, including American Paving Co., FBD Vanguard Construction, Inc., Rolfe Construction Company, Ronnys Inc., United Pavement Maintenance, Inc., and V&G Builders, Inc.
Description
Contract for construction of concrete ADA improvements at Fire Stations 1 and 2, and sidewalks and curb cut ramps at State Streets in the City of Los Banos, California. The contract requires completion within sixty (60) working days. Bids were publicly opened on August 1, 2019.