Award
The University of New Mexico RFQ-1859-16
SRC Project
Recipient
Yearout Service, LLC
Awarded
June 02, 2016
Identifier
RFQ-1859-16
The University of New Mexico (UNM) is the government buyer for this award, specifically for the Student Residence Center (SRC) located on the UNM main campus. The awarded vendor is Yearout Service, LLC. The contract involves mechanical/plumbing construction services for the replacement of domestic hot water, domestic cold water, and fire protection piping serving the SRC dormitories (Buildings 88a-88L) and the SRC Convenience Store (Building 89). The piping replacement is like-for-like in line sizing per the issued U-3 Site Utility Plan and includes complete piping replacement from the existing underground mechanical vault to detail callout 10/U3.1 on Sheet U-3. The existing piping will be abandoned in place, and new piping installed parallel through the parking lot area south of the complex heating water piping. The contractor must provide complete and accurate tie-ins to four lateral piping segments with new sectional valves and suitable valve boxes for asphalt/concrete surfaces, including maintenance access to the pressure reducing valve (PRV). Piping installation involves excavation, backfill, compaction, and replacement of existing improvements such as concrete curb, gutter, sidewalks, asphalt paving, and landscaping to match existing grades. The piping materials specified include PVC (AWWA C900, NSF 61 certified), CPVC (Schedule 80), and PEX-a tube for smaller sizes, with approved equivalents. Valve requirements specify ball, gate, or butterfly valves depending on pipe size, with pressure reducing valves of brass construction using lead-free materials. Insulation materials include calcium silicate or rigid molded cellular glass. The contractor must provide warning marking tape and locator tracer wire, install piping at minimum 36 inches depth with 4 inches clearance, and provide pipe anchors, supports, and transition fittings. The system must pass a water pressure test at 1.5 times max operating pressure or 100 psig for 2 hours with minimal pressure drop, and be disinfected per AWWA C651 with bacteriological samples submitted before service. The contractor must minimize utility downtime to 6 hours and complete the project within 45 calendar days from Notice to Proceed, with liquidated damages of $200 per day for overruns. The contract includes requirements to comply with New Mexico wage rate determinations, insurance, and conflict of interest forms. The project location is the UNM main campus in Albuquerque, NM. The contract is a lump sum bid for the full scope of work described.
Description
Construction services for the domestic hot water and domestic cold water/fire protection piping replacement that serves the Student Residence Center (SRC) dormitories and the SRC Convenience Store at the University of New Mexico central campus. The work includes piping replacement, valve installation, excavation, backfill, compaction, and restoration of affected areas. The project must be substantially complete within 45 calendar days from Notice to Proceed with liquidated damages for overruns.