Award
Kern County 2406441
UPS backup BATTERY Battery Model: 12HX150-E Battery Make: Enersys Battery Warranty: 3 Year Battery Lead Time: 1-2 Wee...
Recipient
Titan Power, Inc.
Award Amount
$9,511.63
Ceiling
$9,511.63
Awarded
September 11, 2023
Identifier
2406441
Kern County awarded purchase order 2406441 to Titan Power, Inc. for UPS battery replacement. The order includes 48 Enersys 12HX150-E batteries (three-year warranty; stated lead time 1–2 weeks) for a Liebert NRB40CCSAHA3029, 30kVA UPS, serial number M13MAA0017. It also includes FOB-destination freight (dock-to-dock delivery; site must accommodate a 53-foot tractor-trailer, and unloading or lift-gate service is excluded), standard-time replacement labor for two technicians (removal and installation, disposal in accordance with applicable regulations, and operational verification during weekday business hours), and materials, supplies, and a trip charge. The battery installation and disposal services are included. The purchase order amount is $9,511.63. Amy Saucerman is the listed contact; the supplied email is orders@titanpower.com.
Description
UPS backup BATTERY Battery Model: 12HX150-E Battery Make: Enersys Battery Warranty: 3 Year Battery Lead Time: 1-2 Weeks String # ('s): 2 Battery # ('s): 24 Batteries for the following equipment Parent Equipment Make: Liebert Parent Equipment Model: NRB40CCSAHA3029 Parent Equipment S/N: M13MAA0017 Parent Equipment Size: 30kVA; FOB DESTINATION Freight is FOB Destination-Transfer of goods occurs once arrived at customer site. Please thoroughly inspect sensitive electronic equipment and note any damage prior to signing for the shipment with the driver for claims purposes. Standard shipping terms-Dock to Dock delivery includes: Site must accommodate a 53' tractor trailer Palletized freight delivered to a dock-level facility on a 53' tractor trailer during regular business hours. Unloading not included/Ground unloading/delivery with Lift Gate not included; UPSBR-LST Contract UPS Battery Replacement Labor-Standard Time-2 Technicians Basic installation Services include removal of batteries parts, installation of new batteries, disposal per local, state and federal regulations, labor to verify operation of UPS system. Work performed during normal business hours (M - F, 8:00AM -5:00PM) All labor, materials, and equipment for the installation of item #1.; MATERIALS Materials, Supplies and Trip Charge