Award
Orange County M00000120217
Project Site Location: Orange County Fire Station 36 12252 Winter Garden Vineland Road Orlando, Florida 32836 Project...
Recipient
XRC LLC DBA
Award Amount
$114,331.00
Ceiling
$114,331.00
Awarded
January 02, 2026
Identifier
M00000120217
The Orange County county government in Florida awarded a contract to XRC LLC DBA for a metal roof replacement at Fire Station 36 located at 12252 Winter Garden Vineland Road, Orlando, Florida. The project involves permitting, removal and replacement of the existing roof with galvanized R panel profile metal roofing, matching color and gauge, along with gutters and downspouts, and proper disposal of materials. The contract obligated amount is $114,331.00, with the award date on January 2, 2026. This appears to be a single-transaction procurement for a specific project, not a multi-year or blanket order.
Description
Project Site Location: Orange County Fire Station 36 12252 Winter Garden Vineland Road Orlando, Florida 32836 Project: Metal Roof Replacement Scope of Work: Permitting - Obtain permits for the project. - Coordinate and schedule all inspections as required by local building codes. Metal Roofing Color Galvanized Metal Profile: R Panel 24 Guage Trim Color: Black Gutter Color: Black 1. Remove and replace exiting roof completely. - Install new metal roof, roofing panels galvanized R panel profile, matching the same gauge and thickness as the existing system over the entire building. - Ensure all pipe boots currently installed are replaced or newly installed as required to maintain roof integrity. - Rake metal trim. Black. - Bay Area add and adjust 4x4 structure in joist. - Scissor 1111 access in Bay Area. 2. Gutters and Downspouts. - Remove and replace all existing gutters and downspouts with new materials, matching the existing profile and color (Black). 3. Material Handling and Disposal. - Provide proper disposal of Al Roofing Materials, including gutters and downspouts. - Use magnets to collect and remove any loose nails or metal debris around the site to ensure clean and safe work environment. 4. Site and Work Conditions. - Maintain the interior of the building dry and protect from weather elements during the roof replacement - Work hours should be between 8 AM and 6 PM. - All work must be conducted without interfering fire services and other critical community services.